Chapter 3: System planning
133
Chap t er 3: Sy st em p lanning
This chapter provides information to help the user to plan a PMP/PTP 450 Platform link.
The following topics are described in this chapter:
l
Typical deployment contains diagrams illustrating typical PMP/PTP 450 Platform site deployments.
l
Site planning describes factors to be considered when planning the proposed link end sites,
including grounding, lightning protection and equipment location.
l
Radio Frequency planning describes how to plan PMP/PTP 450 Platform links to conform to the
regulatory restrictions that apply in the country of operation.
l
Link planning describes factors to be taken into account when planning links, such as range, path
loss and throughput.
l
Planning for connectorized units describes factors to be taken into account when planning to use
connectorized ODUs with external antennas in PMP/PTP 450 Platform links.
l
Data network planning describes factors to be considered when planning PMP/PTP 450 Platform
data networks.
l
Network management planning describes how to plan for PMP/PTP 450 Platform links to be
managed remotely using SNMP.
l
Security planning describes how to plan for PMP/PTP 450 Platform links to operate in secure mode.
l
Remote AP Deployment describes how to deploy Remote AP.
Ty p ical d ep lo y m ent
This section contains diagrams illustrating typical PMP/PTP 450 Platform site deployments.
ODU w it h PoE int er f ace t o PSU
In the basic configuration, there is only one Ethernet interface, a copper cable for Power over Ethernet
(PoE) from the PSU to the ODU (PSU port), as shown in the following diagrams: mast or tower installation
(Mast or tower installation), wall installation (Wall installation) and roof installation (Roof installation).
Summary of Contents for PMP 450 AP
Page 92: ...Chapter 2 System hardware 92 Figure 29 MicroPoP Omni antenna implementation pattern Vertical ...
Page 134: ...Chapter 3 System planning 134 Figure 51 Mast or tower installation ...
Page 135: ...Chapter 3 System planning 135 Figure 52 Wall installation ...
Page 136: ...Chapter 3 System planning 136 Figure 53 Roof installation ...
Page 137: ...Chapter 3 System planning 137 Figure 54 GPS receiver wall installation ...
Page 158: ...Chapter 3 System planning 158 Figure 61 cnMedusa Antenna ...