1 1 |
P a g e
Figure 8. Lamp Key Installation
Figure 9. Lamp Connector
Step 14:
Tighten the captive ground screw to the ground lug on the UV reactor to ensure proper
grounding.
Figure 10. Ground Screw Connection
Step 15:
Your system is now ready to be plugged into the appropriate GFCI protected outlet.
Refer to the following section before any water is allowed to flow through the system.
System Disinfection
With a new installation, or any time the UV system is shut down for service, without power, or is
inoperative for any other reason, the lines in the home or facility could be contaminated. Use the
following steps to fully disinfect the lines throughout the entire home or facility.
Step 1:
Check for and remove any “dead legs” in the lines throughout the home as these can
harbor bacteria. Plug in the UV system and wait until it is ready for operation.
Step 2:
Remove the filter cartridge from the filter housing and fill it with 1-2 cups of household
bleach (most are 5.25% chlorine). Replace the filter housing and slowly turn on the water supply.
Step 3:
At a water outlet, run the water until bleach can be smelled. Repeat this for all taps,
toilets, shower heads, refrigerators, outdoor taps, washing machine, dishwasher, etc. at the
home or facility. Once finished, wait a minumum of 30 minutes before continuing.