background image

Assembly Instructions for the 

Gen2 Vertical Power Model

Step 1: Dolly Assembly:

Standing the frame upright, place the alignment guides of the right-side Wheel Bracket into the groove on 
the outside of the frame.

Place the Frame Reinforcement into the inside channel of the frame.

Place a two-inch bolt through the Wheel Bracket, frame and Frame Reinforcement.

With the Bracket facing forward (away from the Wheel Bracket) slide the Nose Plate Mounting Bracket onto 
the two-inch bolts just installed. Hand-tighten a locknut onto each two-inch Bolt.  DO NOT TIGHTEN THE 
LOCKNUTS.

Insert the axle end WITH the roll pin through the upper (furthest from the frame) hole in the wheel bracket.  
Rotate the axle until the Roll Pin locks into the grove in the wheel bracket.

Insert the second Roll Pin into the axle.

Using the corresponding hole onto the axle, slide the left-side Wheel Bracket onto the axle, fitting the Roll 
Pin into the groove.  

Place the left-side Frame Reinforcement into the inside groove of the frame and install two more two-inch 
bolts as before.

Place the left-side Nose Plate Mounting Bracket onto the two-inch bolt and hand-tighten two locknuts.  DO 
NOT TIGHTEN THE LOCKNUTS.

Inspect all components for proper location and adjust as necessary.

Tighten the two-inch bolts and Locknuts.

Align the square holes of the Nose Plate with the holes in the Nose Plate Mounting Bracket and, using the 4 
carriage bolts provided, attach the Nose Plate to the Frame Assembly.

Slide two thick and one thing washer onto the end of the axle.  With the hub (protruding) side facing the 
Wheel Bracket, slide a wheel onto the axle.  Slide one thin washer onto the axle.

Insert one cotter pin through the hole at the end of the axle and spread the ends to encircle the axle.

Position the handle between the frame rails and align the holes.  Secure with the provide bolts and locknuts.

Step 2: Tank Preparation:

Remove the Push-in Elbow  and Supply Line from inside the tank.

Install the Push-in Elbow into the connector at the bottom-rear of the 23-gallon tank.

Seat the Supply Line into the Push-in Elbow 

Ensure the drain cap is securely in place

Set the tank onto the frame, ensuring that the pre-installed Bracket secures the tank to the frame.

Frame

Wheel Bracket

Frame Reinforcement

Nose Plate 
Mounting 
Bracket

Nose Plate

Right-side Assembly

How the components 

align

Reviews: