background image

Page 4

Page 5

LOCATION

COLD WATER INLET

INSTALLATION

All metalic components of the machine, in direct contact with
drinking water are manufactured from high quality 304 grade
stainless steel, or non ferrous materials, providing maximum
resistance to corrosion.

CONSTRUCTION

To comply with recommendations
from the health and safety executive
it is important that due consideration
be given to safe operation of the
controls of the boiler. The boiler should
therefore be mounted in such a manner
that the operator can stand directly
facing the machine with the controls at
a recommended height from the oor
to the draw-off tap handle of 1200mm
+/- 100mm. Consideration should also
be given to the servicing requirements
of the machine. The maximum and

minimum ambient operating conditions must be between 5 °C
and 35 °C. The appliance is not suitable for installation where
a water jet could be used. Install the boiler in a position having
adequate ventilation, on a level and rm surface suitable for near
boiling temperatures and the working weight of the boiler. Allow
clearance for the easy removal of the outer casing lid and left
hand side panel. A suitably quali ed engineer must install this
unit. Plumbing and electrical installation work is involved.

To comply with the U.K. Water Supply Regulation a single check-
valve must be tted to the supply. BEFORE CONNECTING, THE
SUPPLY PIPE MUST BE THOROUGHLY FLUSHED OUT TO
ENSURE THAT FOREIGN MATTER DOES NOT BLOCK OR
ENTER THE SOLENOID VALVE

The boiler must be connected to a potable water supply using the
food grade hose provided, in a manner which complies with UK
water regulations. The hose should be connected to a ½” (15mm)
drinking water supply via an appropriate isolating valve. The
supply must provide a constant pressure of between 20 KPa and
1000 KPa (0.2 to 10 Bar).
If the water supply contains excessive solids in suspension it is
recommended that a ne mesh “in line” water lter is tted in the
pipe work. Failures due to scale and sediment are not covered by
the warranty.

The boiler must be installed in a location where access is
restricted to operators that are suitably trained, or where
untrained operators of the machine can be supervised by trained
personnel.

MODEL

A

B

C

DRY

WEIGHT

WORKING

WEIGHT

KUDOS

mm 535

380

275

13 Kg

30 Kg

KUDOS 3

mm 745

380

275

21 Kg

48 Kg

KUDOS 3

DUAL FLOW

mm 745

380

275

21 Kg

48 Kg

ALL DIMENSIONS ARE APPROXIMATE

DIMENSIONS AND WEIGHTS

C

B

A

Summary of Contents for KUDOS

Page 1: ...Manuals and Documents Brought to you by Wechillit com Ltd WCI Group House 18 Pride Hill Shrewsbury SY1 1DQ Tel 01743 289418 Fax 01743 289416 Web www wechillit com...

Page 2: ...ERVICING INSTRUCTIONS Calomax Limited Lupton Avenue Leeds LS9 7DD Tel 0113 249 6681 Fax 0113 235 0358 e mail service calomax co uk www calomax co uk Please read these instructions carefully before ope...

Page 3: ...h these instructions For assistance in nding a suitable engineer in your area visit our website www calomax co uk contact our service department on 0113 249 6681 or e mail service calomax co uk CHECK...

Page 4: ...lid and left hand side panel A suitably quali ed engineer must install this unit Plumbing and electrical installation work is involved To comply with the U K Water Supply Regulation a single check va...

Page 5: ...ved the boiler will chill indicated by the Wait Ready light ashing yellow Note When the green service indicator light on the front of the boiler is showing solid colour the header tank sensor has been...

Page 6: ...OR SEVERAL SECONDS AFTER THE TAP HAS BEEN CLOSED NEVER PASS YOUR HAND BENEATH THE NOZZLE Please retain these instructions for future reference Ensure that a suitable drip tray is positioned below the...

Page 7: ...attachment Non swivel nozzles also available please contact Calomax for further information Ref SN made to customer s dimensions x y IC4 4 bay Fused spur time switch Ref 7DFST Max 3kW Plug in time swi...

Page 8: ...ise the element causing failure If in doubt protect the element by hand lling with water to the level of the draw off tap before switching on the electrical supply to the boiler When the green service...

Page 9: ...however that the Triac PCB must be securely mounted against the copper heat sink to ensure reliable heat dissipation Heat transfer compound is also supplied with all replacement circuit boards Adjusti...

Page 10: ...8 10 11 13 14 15 17 18 25 19 22 12 16 3 11 If parts required are not identified please contact Calomax Limited 27 If parts required are not identified please contact Calomax Limited Exploded parts vi...

Page 11: ...IT 25 KUDIHB KUDIHA INTERNAL HOSE ASSEMBLY KUDOS INTERNAL HOSE ASSEMBLY K3 K3 DF 27 26 TBT TN2CK TN3CK CBTS CBTCW KTT KNK KSV TAK NBE3HK CBTSS K3PCBT KUDTC NB15BLG KWTLG DRAW OFF TAP BODY TAP BODY HEA...

Page 12: ...sensors require de scaling or replacing Printed circuit board faulty Clean solenoid lter or replace solenoid work the boiler see Service Instructions page 12 De scale replace sensors Replace P C B Wi...

Page 13: ...base warranty Some factors are beyond our control and would invalidate the warranty offered These include Incorrect installation High Low water pressure Incorrect voltage supply Accidental damage Lime...

Page 14: ...minute 3 Litres minute Average ow from tap Kudos 3 K3 DF Extended nozzle Fast ow nozzle Slow ow nozzle 8 5 Litres minute 6 Litres minute 3 5 Litres minute Voltage 220 240 V ac 50 60 Hz Power rating 3k...

Reviews: