Calomax KUDOS Installation, Operation And Servicing Instructions Download Page 9

Page 14

Page 15

General function

The printed circuit board (PCB) controls the heating and lling
functions of the boiler by monitoring the thermistors and level
sensors. The PCB also controls the external light unit to indicate
the current state of the boiler. Red and yellow LED’S on the circuit
board indicate whether the PCB has energised the element or
solenoid respectively.

Should an element fail and need to be replaced, it may be
necessary to replace the lid gasket to ensure a reliable steam-tight
seal.

Note: the element has a permanent ‘Live’ feed, and the

‘Neutral’ is switched.

Printed Circuit Board replacement (PCB)

In the event of a PCB failing and a replacement being required, full
instructions will be supplied. It is important to note however, that the
Triac PCB must be securely mounted against the copper heat-sink
to ensure reliable heat dissipation. Heat transfer compound is also
supplied with all replacement circuit boards.

Adjusting the Water Temperature Set Point

The temperature potentiometer (Pot) is pre-set at Calomax and
will only require adjustment in exceptional circumstances. Contact
Calomax for advice.

Water boils at different temperatures depending on barometric
pressure. The temperature should not be tuned higher than 98

°C

, or

over boiling may occur during low barometric pressure conditions,
causing the unit to trip the overheat cut-out device.

1

2

4

*

6

7

9

8

1

0

1

1

1

3

1

4

1

5

1

7

1

8

2

5

1

2

1

9

2

0

*

*

E

x

p

lo

d

e

d
p

a

rt

s
v

ie

w

K

u

d

o

s

(T

o
b

e
re

a

d
in
c

o

n

ju

n

c

tio

n
w

it

h
th

e
s

p

a

re
p

a

rt

s
lis

t)

1

6

F

it

te

d
a

s
s

ta

n

d

a

rd

.

It

e

m
3

a

v

a

ila

b

le
a

s
a

lt

e

rn

a

tiv

e

H

o

u

s

e

s
it

e

m
2

3

In

c

lu

d

e

s
th

e

rm
is

to

r

p

o

c

k

e

t,

a

ll

w

a

s

h

e

rs
&
n

u

ts

*

*

*

1

1

If

p

a

rt

s
re

q

u

ir

e

d

a

re
n

o

t

id

e

n

tif

ie

d

,

p

le

a

s

e
c

o

n

ta

c

t

C

a

lo

m
a

x
L

im
it

e

d

2

6

Summary of Contents for KUDOS

Page 1: ...Manuals and Documents Brought to you by Wechillit com Ltd WCI Group House 18 Pride Hill Shrewsbury SY1 1DQ Tel 01743 289418 Fax 01743 289416 Web www wechillit com...

Page 2: ...ERVICING INSTRUCTIONS Calomax Limited Lupton Avenue Leeds LS9 7DD Tel 0113 249 6681 Fax 0113 235 0358 e mail service calomax co uk www calomax co uk Please read these instructions carefully before ope...

Page 3: ...h these instructions For assistance in nding a suitable engineer in your area visit our website www calomax co uk contact our service department on 0113 249 6681 or e mail service calomax co uk CHECK...

Page 4: ...lid and left hand side panel A suitably quali ed engineer must install this unit Plumbing and electrical installation work is involved To comply with the U K Water Supply Regulation a single check va...

Page 5: ...ved the boiler will chill indicated by the Wait Ready light ashing yellow Note When the green service indicator light on the front of the boiler is showing solid colour the header tank sensor has been...

Page 6: ...OR SEVERAL SECONDS AFTER THE TAP HAS BEEN CLOSED NEVER PASS YOUR HAND BENEATH THE NOZZLE Please retain these instructions for future reference Ensure that a suitable drip tray is positioned below the...

Page 7: ...attachment Non swivel nozzles also available please contact Calomax for further information Ref SN made to customer s dimensions x y IC4 4 bay Fused spur time switch Ref 7DFST Max 3kW Plug in time swi...

Page 8: ...ise the element causing failure If in doubt protect the element by hand lling with water to the level of the draw off tap before switching on the electrical supply to the boiler When the green service...

Page 9: ...however that the Triac PCB must be securely mounted against the copper heat sink to ensure reliable heat dissipation Heat transfer compound is also supplied with all replacement circuit boards Adjusti...

Page 10: ...8 10 11 13 14 15 17 18 25 19 22 12 16 3 11 If parts required are not identified please contact Calomax Limited 27 If parts required are not identified please contact Calomax Limited Exploded parts vi...

Page 11: ...IT 25 KUDIHB KUDIHA INTERNAL HOSE ASSEMBLY KUDOS INTERNAL HOSE ASSEMBLY K3 K3 DF 27 26 TBT TN2CK TN3CK CBTS CBTCW KTT KNK KSV TAK NBE3HK CBTSS K3PCBT KUDTC NB15BLG KWTLG DRAW OFF TAP BODY TAP BODY HEA...

Page 12: ...sensors require de scaling or replacing Printed circuit board faulty Clean solenoid lter or replace solenoid work the boiler see Service Instructions page 12 De scale replace sensors Replace P C B Wi...

Page 13: ...base warranty Some factors are beyond our control and would invalidate the warranty offered These include Incorrect installation High Low water pressure Incorrect voltage supply Accidental damage Lime...

Page 14: ...minute 3 Litres minute Average ow from tap Kudos 3 K3 DF Extended nozzle Fast ow nozzle Slow ow nozzle 8 5 Litres minute 6 Litres minute 3 5 Litres minute Voltage 220 240 V ac 50 60 Hz Power rating 3k...

Reviews: