![background image](http://html1.mh-extra.com/html/calimet/cm3-acfp/cm3-acfp_instruction-manual_3441798009.webp)
8
Figure 9
1. MUST use UL approved power wires, power wires MUST have a minimum capacity
for
1
5
a
mp current.
2. All operators MUST be properly grounded in order to prevent an electrical charge.
Must use a dedicated circuit for power supply.
3. When the power is connected, turn the power switch to the ON position.
Installation
Step 4:
Connecting the Power
See which direction your
gate opens
when viewed from the inside (exit side)
.
Dip Switch #6 (Figure 10) on the bottom of the gate operator circuit board
controls the open direction.
O
N
= opens
to the
right,
O
FF
= opens
to the
left
Figure 10
Step 5: Open Direction