![background image](http://html1.mh-extra.com/html/calimet/cm3-acfp/cm3-acfp_instruction-manual_3441798007.webp)
6
1. Lay out position of 6 wedge anchors by measuring clearance between anchors
and inside edge of gate. Figure 5
2. Install underground conduits in area for conduits. Figure 6
Figure 5
Figure 6
Installation
Step 2:
Install
ing the
Base
Contact local underground utility locating companies before digging more than 12 inches deep to
avoid damaging under
gr
ound power, gas
,
or other ut
i
lity lines.
Wedge Anchor
Size of concrete base
A minimum of 2" on each side of the operator is recommended.
The base, also known as a pad is a raised platform. We recommend using a concrete base.
1/2" x 3 1/2"