Installation

The  SATK  series  HIU  is  designed  for  installation  in  a  sheltered

domestic  environment  (or  similar),  therefore  cannot  be  installed  or

used outdoors, i.e. in areas directly exposed to atmospheric agents.

Outdoor installation may cause malfunctioning and hazards.

If the device is enclosed inside or between cabinets, sufficient space

must  be  provided  for  routine  maintenance  procedures.  It  is

recommended that electrical devices are NOT placed underneath the

HIU, as they may be damaged in the event of leaks occurring at the

hydraulic fittings.

If  this  advice  is  not  respected,  the  manufacturer  cannot  be  held

responsible for any resulting damage.

In the event of a malfunction, fault or incorrect operation, the device

should be deactivated; contact a qualified technician for assistance.

Preparation

After establishing the device installation point proceed as follows:

· Mark the holes required for securing the HIU to the wall

· Mark the position of the hydraulic connections

Check  the  measurements  again  and  begin  laying  the  following

pipelines:

1. connection to the centralized line

2. heating circuit

3. domestic water circuit

N.B.: 

the  wall  anchors  can  only  guarantee  effective  support  if

inserted correctly (in accordance with good technical practice) into

walls built using solid or semi-solid bricks. If working with walls built

using  perforated  bricks  or  blocks,  mobile  dividing  panels  or  any

masonry walls other than those indicated, a preliminary static test

must be carried out on the support system.

Hydraulic connections

Hydraulic connections to the centralized line must be implemented

using the shut-off valves, which allow any necessary maintenance

work to take place without having to empty the centralized system.

It  is  advisable  to  also  install  manual  shut-off  valves  on  the  lower

terminals for connection to the apartment heating system.

Initial Operation 

Filling the central heating system

Open the shut-off valves on the connections to the centralized line

and,  in  the  central  heating  system,  proceed  with  charging  the

system to the design pressure.

Once these procedures are complete, vent the system and check its

pressure again (repeat the filling process if necessary).

Setting domestic hot water temperature according to primary

flow temperature.

Open the domestic hot water taps, while the central heating system

is working, and set the required temperature turning the blue

handle (A).

Maintenance

All maintenance procedures should be carried out by an authorized

technician.

Regular maintenance guarantees better efficiency and helps to save

energy.

Before  carrying  out  any  maintenance,  repair  or  part  replacement

work, proceed as follows:

- Close the shut-off valves

- Empty the HIU using the cocks provided.

Exchanger replacement

- Remove the exchanger using the 2 hex head screws fixing it in place 

(B)

- Replace the exchanger, fitting new O-rings

- Tighten the two fixing screws (B).

Warnings 

These instructions must be read and understood before installing and maintaining the device. The symbol means:

CAUTION! FAILURE TO FOLLOW THESE INSTRUCTIONS COULD RESULT IN A SAFETY HAZARD!

Warnings

CAUTION!

YOUR SAFETY IS INVOLVED. FAILURE TO FOLLOW THESE INSTRUCTIONS MAY RESULT IN INJURY

THE PRODUCT SUPPLIED WITH THIS INSTRUCTION SHEET IS REFERRED TO BELOW AS ‘DEVICE’

1 The device must be installed, pre-run checked and maintained by qualified technical personnel in accordance with national regulations and/or relevant local

requirements. 2 If the device is not installed, pre-run checked and maintained correctly in accordance with the instructions provided in this manual, it may not work

properly and may endanger the user. 3 Clean the pipes of any particles, rust, incrustations, limescale, welding slag and any other contaminants. The hydraulic circuit

must be clean. 4 Make sure that all connection fittings are watertight. 5 When connecting water pipes, make sure that threaded connections are not mechanically

overstressed. With time this may result in breakage with water leakage, causing damage and/or personal injury. 6 Water temperatures higher than 50°C may cause

severe burns. When installing, pre-run checking and servicing the device, take the necessary precautions so that these temperatures will not be hazardous for people.

7 In the case of particularly hard or impure water, there must be suitable provision for filtering and treating the water before it enters the device, in accordance with

current legislation. Otherwise the device may be damaged and will not work properly. 8 Any use of the device other than its intended use is prohibited. 9 Any coupling

of the device with other system components must be made while taking the operational characteristics of both units into consideration. An incorrect coupling could

compromise the operation of the device and/or system.

LEAVE THIS MANUAL AS A REFERENCE GUIDE FOR THE USER. DISPOSE OF THE PRODUCT IN COMPLIANCE WITH CURRENT LEGISLATION

SAFETY INSTRUCTIONS

A

B

Summary of Contents for SATK Series

Page 1: ...85 C Max pressure primary circuit PN 10 bar domestic hot water circuit PN 10 bar DHW exchanger capacity 40 kW Domestic hot water flow rate min 1 8 0 3 l min max 18 l min HIU connections Primary circui...

Page 2: ...ired temperature turning the blue handle A Maintenance All maintenance procedures should be carried out by an authorized technician Regular maintenance guarantees better efficiency and helps to save e...

Page 3: ...evre PN 10 bar S cak su devresi PN 10 bar SKS e anj r kapasitesi 40 kW S cak su ak debisi min 1 8 0 3 l dk max 18 l dk HIU Ba lant lar primer devre 3 4 M s tma devresi 3 4 M SKS devresi 3 4 M Kutu i e...

Page 4: ...D zenli bak m daha iyi verimlilik sa lar enerji tasarrufuna yard mc olur Herhangi bir bak m onar m veya par a de i tirme i lemine ba lamadan nce a a daki i lemlerin uygulanmas gerekir Kesme vanalar n...

Page 5: ...zio circuito primario PN 10 bar circuito sanitario PN 10 bar Potenza nominale scambiatore sanitario 40 kW Portata circuito sanitario min 1 8 0 3 l min max 18 l min Collegamento satelliti circuito prim...

Page 6: ...ia dell utenza e impostare la temperatura desiderata ruotando la manopola nera A Manutenzione Per tutte le operazioni di manutenzione straordinaria richiedere l intervento di un tecnico abilitato La r...

Page 7: ...m rkreis PN 10 bar Warmwasserkreis PN 10 bar Nennleistung Warmwasser W rmetauscher 40 kW Durchflussmenge Warmwasserkreis Min 1 8 0 3 l min Max 18 l min Anschluss der W rme bergabestationen Prim rkreis...

Page 8: ...n des schwarzen Handrads A einstellen Wartung F r alle au ergew hnlichen Wartungsarbeiten immer eine Fachkraft anfordern Regelm ige Instandhaltung gew hrleistet einen besseren Wirkungsgrad und Energie...

Reviews: