background image

   

 

PYROSTAR 

 SMOKE FAN F400-120 

 

MS-MTG-001 

Ind  E 

01/10/2019 

Page 2/8 

 

INDEX 

 

I.

 

AT DELIVERY ................................................................................................................................................................................................................................................................................................................................................................................................... 3

 

I.1.

 

Checkings at delivery .................................................................................................................................................................................................................................................................................................................................................................. 3

 

I.2.

 

Unpacking ................................................................................................................................................................................................................................................................................................................................................................................................. 3

 

I.3.

 

Storage ....................................................................................................................................................................................................................................................................................................................................................................................................... 3

 

II.

 

INSTALLATION ................................................................................................................................................................................................................................................................................................................................................................................................. 3

 

II.1.

 

Handling ..................................................................................................................................................................................................................................................................................................................................................................................................... 3

 

II.2.

 

Space required for maintenance............................................................................................................................................................................................................................................................................................................................ 4

 

II.3.

 

II.3 Installation .......................................................................................................................................................................................................................................................................................................................................................................... 4

 

III.

 

ELECTRICAL WIRING ................................................................................................................................................................................................................................................................................................................................................................................. 4

 

III.1.

 

Wiring .................................................................................................................................................................................................................................................................................................................................................................................................. 4

 

III.2.

 

1 speed motors .......................................................................................................................................................................................................................................................................................................................................................................... 4

 

III.3.

 

III.3 2 speeds motors........................................................................................................................................................................................................................................................................................................................................................... 5

 

III.4.

 

III.4 2 speeds motors (separate windings) .................................................................................................................................................................................................................................................................................................... 5

 

IV.

 

IV BELT DRIVE ............................................................................................................................................................................................................................................................................................................................................................................................... 6

 

IV.1.

 

IV.1 Belt correct alignment........................................................................................................................................................................................................................................................................................................................................... 6

 

IV.2.

 

IV.2 Belt tension ...................................................................................................................................................................................................................................................................................................................................................................... 6

 

IV.3.

 

IV.3 Variable pulley settings ......................................................................................................................................................................................................................................................................................................................................7

 

V.

 

Troubleshooting.........................................................................................................................................................................................................................................................................................................................................................................................7

 

VI.

 

NOTES ................................................................................................................................................................................................................................................................................................................................................................................................................... 8

 

 

Summary of Contents for PYROSTAR F400-120

Page 1: ...PYROSTAR SMOKE FAN F400 120 MS MTG 001 Ind E 01 10 2019 Page 1 8 INSTALLATION AND COMMISSIONING MANUAL...

Page 2: ...I 1 Handling 3 II 2 Space required for maintenance 4 II 3 II 3 Installation 4 III ELECTRICAL WIRING 4 III 1 Wiring 4 III 2 1 speed motors 4 III 3 III 3 2 speeds motors 5 III 4 III 4 2 speeds motors se...

Page 3: ...handled using a fork lift truck ensure this supports the load bearing structure and does not touch the panels enclosing the unit If the device is moved using a crane use four cables of identical lengt...

Page 4: ...outdoor or when installed indoor separated from other volumes by a 1 hour fire resistant wall The door of the technical room should be hour fire resistant Ventilation of this technical room should com...

Page 5: ...4 III 4 2 speeds motors separate windings 2 speeds 1 voltage separate windings 400 V 4 6 poles motors Low speed High speed Once wiring is done check if the impeller is turning in the right direction I...

Page 6: ...eck pulleys alignment both motor and impeller pulleys along with belt tension IV 2 IV 2 Belt tension Please refer to the following table for belt s tension I pulleys axle spacing F belt deflection P f...

Page 7: ...rflow After settings make sure both locking screws are secured and the the pulleys alignment is fine V Troubleshooting Problem Main reasons How to solve Fan not running Main power off Thermal motor pr...

Page 8: ...PYROSTAR SMOKE FAN F400 120 MS MTG 001 Ind E 01 10 2019 Page 8 8 VI NOTES Date Observations...

Reviews: