7
Installation
Step 7
Illustration A
Step 7
Illustration B
Step 6
Illustration A
Step 6
Illustration B
STEP 6.
Use rubber mallet to gently hammer flange bearings into both sides of 2” Upper Lift Arm.
a. Slide 2” Upper Lift Arm (
red decal
) into Adjustable Clevis (
red decal
) on Gate Post.
b. Insert
3
/
8
” x 3” hex bolt and tighten
3
/
8
” nylock nut.
4
9.1
9.11
9.3
Red
Decal
Red
Decals
STEP 7.
Slide 1
3
/
4
” Upper Lift Arm (
blue decal
) into 2” Lift Arm (
red decal
).
a. Insert
3
/
8
” x 2
1
/
4
” hex bolts and
3
/
8
” nylock nuts at pre-drilled holes.
NOTICE
To protect the Powder Coat finish, do
not slide beyond desired length.
9.3
9.6
4
5
© CAI Safety Systems | (951) 465-7386 | https://caisafety.com | [email protected]