16
Rev022520
Inspection and Maintenance
XI. Inspection and Maintenance (Minimum Annually)
IMPORTANT!
Consult parts list before replacing fasteners, as all have specific design load requirements. Only use
like items for replacement.
A. Gate:
1. Inspect components for damage and misalignment. Adjust, repair, or replace as needed, to meet original
design tolerance.
2. Check for proper alignment with catch. Adjust as necessary to achieve proper alignment.
3. Dampeners are maintenance free, replace dampener if assisting force has diminished.
4. Inspect bumpers for damage or wear, replace as needed.
B. Fasteners and mechanical connections:
1. All fasteners must be in place and adjusted to their original design standard. Replace any damaged
components.
2. Check all mounting connections, making sure they meet original design standards (refer to instructions).
3. If gate closes too quickly, fasteners at four corners of the gate can be tightened to reduce closing speed.
4. If gate closes too slowly, fasteners at four corners of the gate can be loosened to increase closing speed.
C. Finishes:
1. Inspect and clean finishes periodically.
2. Touch up repair finishes, or refinish as necessary to protect the structural integrity of the Smart Gate.
3. The PCY Smart Gate comes with a polyester powder coat finish. Use finish materials compatible with powder
coat. Follow paint manufacturers’ instructions for prep and touch-up.
D. Housekeeping:
1. To ensure your product continues to operate and last, upon completion of proper installation, complete the
following:
a. Clean all surfaces.
b. If project is ongoing, protect installed products until final completion of project.
c. Touch-up, repair, or replace damaged components.
2. Ensure the horizontal bars are clear of debris and interferences.
E. Labels and Placards:
1. Inspect all labels and placards.
2. Replace any labels and placards which are unreadable/missing.
© CAI Safety Systems | (951) 465-7386 | https://caisafety.com | [email protected]