ENCORE GROUND Rev. 1 2021-10
www.cafection.com 800-561-6162
20
SERVICE & INSTALLATION MANUAL for Cafection's Encore Ground
4.4
Leveling the Equipment
For optimal performance of the equipment, it is important to ensure that it is leveled. Avoiding to do
so can create variations in product delivery.
1. Open the brewer's door and place a level on a flat surface (e.g. internal waste bin shelf).
2. Adjust the four (4) threaded leveling glides of the equipment to reach a leveled position.
4.5
Drip Tray Installation
Place the drip tray grill on the drip tray, then slide the tray under the machine and find the
two (2) hooks to secure it in place. See the image below for reference.
Hooks
Drip tray
grill
Drip tray
In
it
ia
l S
e
tu
p