CB-MAN-64
Operator's Manual - Boom 64M, 72M, 76M
Page 15 of 74
Cadman Power Equipment Limited ▪ BOX 100, Courtland, Ontario, Canada N0J-1E0 ▪ Phone: 519-688-2222 ▪ Fax: 519-688-2100 ▪ www.cadmanpower.com
Step 2
Unfold your irrigation boom one section at a time, while alternating sides as you unfold
sections one at a time. Guide each section as they rotate to the open position. Verify that
each boom section is completely latched before unfolding the next section.
Figure 14 - Unfolding Boom Order
img-01466
Failing to open your irrigation boom by alternating sections will result in an
unbalanced irrigation boom that will tip over. This will result in damage to
your irrigation boom, and may cause injury and/or death.