9
SHELL - BREEZE
Fig. 9 - Phase1
Fig. 10 - Phase 2
Fig. 11 - Phase 3
• Original position with completely embedded tube (see
Fig. 9
).
• Pull out the tube for 2 cm (see
Fig. 10
).
• Insert the female tube ø 6 cm (see
Fig. 11
).
4.3
COMBUSTIBLE AIR INLET FOR SEALED-CHAMBER INSTALLATION (SHELL
3
UP - BREEZE AT)
How to connect to the stove in the sealed chamber with concentric system:
Fig. 12 - Phase1
Fig. 13 - Phase 2
• Connect the concentric pipe with the fitting located behind the stove (see
Fig. 12
).
• Push the concentric pipe up to stroke end (see
Fig. 13
).