Fig. 48 - Secure the front side panel
Fig. 49 - Secure the rear side panel
• Secure the side panel on the front (see
• Secure the side panel on the back of the stove (see
).
• Reposition the cover with the screws.
6.10 ASSEMBLING THE TOP CLADDING AND BOTTOM DOOR
To assemble the cladding, proceed as follows:
Place the top panel on the stove (if maiolica).
Attach the top in the specific slots (if in metal).
Fig. 50 - Placing the top panel
Fig. 51 - Hook the panel
Fig. 52 - Hook the panel.
6.11 ELECTRIC CONNECTION
Warning: the appliance must be installed by an authorized technician!
• The electric connection occurs through a cable with plug put in an electric socket which is able to support charge and tension
specific of every model, as described in the technical datas table (see
• The plug must be easily accessible when the appliance is installed.
• Please further assure you that your network is endowed with an efficient earth connection: if it does not exist or if it is not
efficient, please endow you with one in compliance with the law.
• Connect the supply cable first on the back of the stove (see
) and then at a wall electric socket.
Fig. 53 - Electric socket with master switch
Fig. 54 - Plug connected
• Do not use extension cables.
• If the feeder cable is damaged, it must be replaced by an authorized technician.