IDRO PRINCE
3
12-16-23-23 H
2
O - IDRO PRINCE 30-30 H
2
O - AQUOS
3
16-23-23 H
2
O - IDRON 16-22 AIRTIGHT - MIRA 16-22 - TESIS 16-23 AIRTIGHT - HIDROFIRE 22.8
2
SUMMARY
1 INTRODUCTION ............................................2
2 WARNINGS AND WARRANTY TERMS ..............3
2.1 SAFETY WARNINGS .................................................3
2.2 INFORMATION .........................................................4
2.3 INTENDED USE ........................................................4
2.4 WARRANTY CONDITIONS ........................................4
2.5 WARNINGS ON PROPER PRODUCT DISPOSAL .........5
3 INSTALLATION ..............................................6
3.1 INSTALLATION STANDARDS ....................................6
3.2 PELLETS ...................................................................6
3.3 FOREWORD .............................................................7
3.4 MINIMUM DISTANCES .............................................8
3.5 FOREWORD .............................................................8
3.6 FLUE ........................................................................8
3.7 TECHNICAL FEATURES .............................................9
3.8 SIZING ...................................................................12
3.9 MAINTENANCE ......................................................12
3.10 CHIMNEY CAP .......................................................12
3.11 CHIMNEY COMPONENTS .......................................13
3.12 OUTSIDE AIR VENT ................................................13
3.13 CONNECTION TO THE FLUE ....................................15
3.14 EXAMPLES OF PROPER INSTALLATION..................15
4 DRAWINGS AND TECHNICAL FEATURES ........17
12 DIMENSIONS .............................17
4.3 DIMENSIONI STUFA IDRO PRINCE 30 - 30 H
O DIMENSIONS .....................20
4.5 IDRON 16-22 AIRTIGHT - HIDROFIRE 22.8 - MIRA 16-
22 - TESIS 16-23 AIRTIGHT DIMENSIONS ........................21
4.6 TECHNICAL FEATURES ...........................................22
5 INSTALLATION AND ASSEMBLY ....................27
5.1 PREPARATION AND UNPACKING ...........................27
5.2 IDRO PRINCE
22 - TESIS 16-23 AIRTIGHT - FRAME ASSEMBLY ..................28
5.3 ASSEMBLING AQUOS SIDE PANELS
5.4 ASSEMBLING THE IDRON 16-22 AIRTIGHT / HIDROFIRE
22.8 SIDE PANELS ............................................................29
6 LOADING PELLETS ......................................30
6.1 LOADING PELLETS .................................................30
6.2 SAFETY ..................................................................31
6.3 USER TRAINING .....................................................31
7 PLUMBING CONNECTION.............................32
7.1 PLUMBING SYSTEM CONNECTION.........................32
7.2 CONNECTION DIAGRAM (IDRO PRINCE
7.3 CONNECTION DIAGRAM IDRO PRINCE
16-23 , IDRON 16-22 AIRTIGHT, HIDROFIRE 22.8 - MIRA 16-
22 - TESIS 16-23 AIRTIGHT ...............................................33
7.4 CONNECTION DIAGRAM IDRO PRINCE 30 .............34
7.5 CONNECTION DIAGRAM (IDRO PRINCE
O) ...............................................................35
7.6 CONNECTION DIAGRAM (IDRO PRINCE 30 H
7.7 3 BAR DISCHARGE VALVE ......................................36
7.8 SYSTEM CONNECTIONS .........................................36
7.9 WASHING THE SYSTEM .........................................37
7.10 FILLING THE SYSTEM .............................................37
7.11 WATER CHARACTERISTICS ....................................37
8 ELECTRICAL CONNECTION ...........................38
9 FIRST IGNITION WARNINGS ........................39
9.1 GENERAL WARNINGS ............................................39
10 CONTROL PANEL .........................................40
11 MENU HEADINGS AND FUNCTION ................41
11.1 PROGRAMMED MODE (TIMER) - MAIN MENU ........41
11.2 NOTES FOR TIMER OPERATION ..............................42
11.3 SLEEP FUNCTION (MAIN MENU) ...........................42
11.4 ADJUSTMENTS MENU ...........................................42
11.5 SETTINGS MENU ....................................................42
11.6 AUTO ECO MODE (SEE SECTION F-G) .....................46
11.7 SYSTEM CONFIGURATION .....................................47
11.8 SYSTEM WITH: DIRECT VENT PELLET STOVE AND
ROOM PROBE ...................................................................47
11.9 SYSTEM WITH: DIRECT VENT PELLET STOVE AND
ROOM THERMOSTAT ........................................................48
11.10 SYSTEM WITH: DIRECT VENT PELLET STOVE, ROOM
PROBE, AND DHW BOILER ...............................................49
11.11 SYSTEM WITH: DIRECT VENT PELLET STOVE, ROOM
THERMOSTAT, AND DHW BOILER .....................................49
11.12 SYSTEM WITH: PELLET STOVE AND PUFFER..........50
11.13 SYSTEM WITH: PELLET STOVE, PUFFER, AND
AUXILIARY BOILER (WALL MOUNTED) ............................51
11.14 OPERATING MODE .................................................52
11.15 ELECTRICAL CONNECTIONS ...................................53
11.16 START-UP ..............................................................53
11.17 POWER OUTPUT ....................................................54