Page 4
509 Sharptown Road P.O. Box 345 Bridgeport, NJ 08014
Email: [email protected] Fax: 856-467-5511
Internet: http://caddycorp.com Phone: 856-467-4222
Utility Distribution System Model OD
Installation
1.
Read entire manual and study drawings before starting installation.
2.
Check that all electrical and plumbing rough-ins are as specified and agree with the drawing.
3.
The OD system consists of the following parts:
a.
Riser
b.
Raceway
4.
Remove all access panels on raceway and riser to reveal internal plumbing, electrical systems, and internal
flanges.
5.
Place OD sections according to the drawing to determine the proper mounting position.
6.
Once sections are in position, join field joints (if any) by bolting internal flanges together and apply silicone
sealant over seams.
7.
OD mounting procedure:
a.
Position unit flush with finished ceiling (see submission drawing).
b.
Bolt 3/8" mounting rod into holes provided in each riser.
c.
Stabilize each 3/8” rod to cross member of ceiling.