4-12 SmartSwitch 9A100 User Guide
PVC Connections
Switch Administration
4.5.1
Point-to-Point PVCs
The procedure for setting up a PVC connection between two end nodes through the SmartSwitch 9A100 consists of
specifying the ports and the virtual path and virtual channel identifiers (VPI and VCI).
1.
Use
add trafficdescriptor
to define a traffic descriptor to use with the PVC.
SmartSwitch # add trafficdescriptor
TrafficType(UBR) : cbr
TrafficDescriptorType(2) :
PCRCLP01(100) :
PCRCLP0(0) :
SCRCLP01(0) :
SCRCLP0(0) :
MBSCLP01(0) :
MBSCLP0(0) :
QOSCLASS(1) :
AalType(5) :
SmartSwitch #
For this example, we specify CBR as the traffic type, then take the remaining defaults. Enter the
show
trafficdescriptor
command to obtain the index number of the new traffic descriptor. In this example, the index
number is two (2).
SmartSwitch # show trafficdescriptor
==================================================================================
TD# Traff Desc QoS Peak Cell Rate Sust Cell Rate Max Burst Size Aal
Type Type (Kb/s) (Kb/s) (Kb/s) Type
CLP_0 CLP_0+1 CLP_0 CLP_0+1 CLP_0 CLP_0+1
==================================================================================
2 CBR 2 1 0 100 0 0 0 0 5
176 NRTVBR 2 1 0 1585 0 0 0 0 5
SmartSwitch #
2.
Use
add pvc
to create the PVC; specify the ports through which the connection is established, the
VPI/VCI pair to use with each port, and the traffic descriptor to use.
SmartSwitch # add pvc
ConnType(PTP) :
LowPortID() : c1
<we specify port c1
LowVPI() : 0
<we specify VPI = 0
LowVCI() : 100
<we use VCI = 100
HighPortID() : b2
<we specify port b2
HighVPI() : 0
HighVCI() : 100
FwdTrafficDescriptorIndex() : 2
<we use our created traffic descriptor
BkwTrafficDescriptorIndex() : 2
<we use our created traffic descriptor
SmartSwitch #
The example above creates a PVC between ports C1 and B2 with VPI/VCI = 0/100.
3.
Plug the end nodes into the specified SmartSwitch 9A100 ports (C1 and B2).
4.
Configure each end node with the proper IP address, subnet mask, and VPI/VCI pair = 0/100.
The end nodes can communicate with each other through the point-to-point PVC connection.
Summary of Contents for SmartSwitch 9A100
Page 12: ...xii SmartSwitch 9A100 User Guide TABLE OF CONTENTS...
Page 14: ...xiv SmartSwitch 9A100 User Guide List of Figures...
Page 16: ...xvi SmartSwitch 9A100 User Guide List of Tables...
Page 18: ...1 2 SmartSwitch 9A100 User Guide Introduction...
Page 34: ...2 16 SmartSwitch 9A100 User Guide SmartSwitch ATM Administrator Switch Installation and Setup...
Page 42: ...3 8 SmartSwitch 9A100 User Guide F amV m h d F 2 6 3 F 1 m 2...
Page 80: ...5 6 SmartSwitch 9A100 User Guide Troubleshooting Congestion Troubleshooting...
Page 86: ...A 6 SmartSwitch 9A100 User Guide Technical Specifications Specifications...