4-4 SmartSwitch 9A100 User Guide
ATM Routing
Switch Administration
Note
Dotted lines in the diagrams below represent one-way routes to the devices
pointed to by the arrowheads. Each route is defined on the device from which the
dotted line originates.
Figure 4-1 IISP route across PNNI domain
A second IISP device (Switch D) is added behind Switch A. If Switch D also needs to reach Switch C for LECS
support, you must define additional IISP routes between Switches D and C, B and D, and A and D. Figure 4-2 shows
the typical “route to every point reached” IISP topology.
Figure 4-2 Routes needed for a second IISP switch
A
B
C
LEC
LECS
Physical link
IISP route
IISP Domain
PNNI Domain
B
C
LECS
A
LEC
D
Physical link
IISP route
LEC
IISP Domain
PNNI Domain
Summary of Contents for SmartSwitch 9A100
Page 12: ...xii SmartSwitch 9A100 User Guide TABLE OF CONTENTS...
Page 14: ...xiv SmartSwitch 9A100 User Guide List of Figures...
Page 16: ...xvi SmartSwitch 9A100 User Guide List of Tables...
Page 18: ...1 2 SmartSwitch 9A100 User Guide Introduction...
Page 34: ...2 16 SmartSwitch 9A100 User Guide SmartSwitch ATM Administrator Switch Installation and Setup...
Page 42: ...3 8 SmartSwitch 9A100 User Guide F amV m h d F 2 6 3 F 1 m 2...
Page 80: ...5 6 SmartSwitch 9A100 User Guide Troubleshooting Congestion Troubleshooting...
Page 86: ...A 6 SmartSwitch 9A100 User Guide Technical Specifications Specifications...