
ASSEMBLY
RMB 1445 11/10
Assembly Section 3-9
© 2010 Alamo Group Inc.
ASSEMBL
Y
FINAL ASSEMBLY CHECKS
1.
With the arms at half reach and with the flail head clear of the ground carry out final adjustment of the lift
arm levelling box to bring the main frame horizontal.
2.
Tighten check chains and/or stabilizer bars.
3.
Carefully operate the machine through its full range of movements while checking that hoses are not under
tension, pinched, frayed, or kinked and that all movements are functioning correctly.
4.
Fold the machine into the transport position. The machine is now ready to proceed to the work site.
OIL REQUIREMENTS
Tank
The machine is delivered from the factory without oil. Fill the reservoir with a light hydraulic oil as
recommended in the chart until the oil level is approximately 3” below the top of the tank. The total capacity is
approximately 65 liters (17 gallons). Do not overfill. The oil must have anti-frothing characteristics suitable for
use in hydraulic systems.
Supplier
Cold or Temperature Climate
Hot Climate
Castrol
Agricastrol hydraulic oil
Hy-spin AWS46
Hy-spin AWS68
Shell
Tellus 46
Tellus 68
Mobil
D.T.E. 25
D.T.E. 26
Esso
Nuto “H” or “A” 46
Nuto “H” or “A” 68
Texaco
Rando HD 46
Rando HD 68
Gulf
Hydrasil 46
Hydrasil 68
B.P.
Energal HLP 46
Energal HLP 68
Dalton
Silkolene Dove 46 or
Derwnet 46
Silkolene Dove 68
Elf
Hydrelf 46
Hydrelf 68
ISO VG
46
68
SAE
10W
20
Summary of Contents for RMB 1445
Page 8: ......
Page 9: ...Safety Section 1 1 SAFETY SECTION ...
Page 38: ......
Page 39: ...Introduction Section 2 1 INTRODUCTION SECTION ...
Page 43: ...Assembly Section 3 1 ASSEMBLY SECTION ...
Page 54: ......
Page 55: ...Operation Section 4 1 OPERATION SECTION ...
Page 101: ...Maintenance Section 5 1 MAINTENANCE SECTION ...
Page 110: ...MAINTENANCE RMB 1445 11 10 Maintenance Section 5 10 2010 Alamo Group Inc MAINTENANCE ...
Page 111: ......
Page 114: ...RMB 1445 11 10 P N 50068815C Printed U S A RMB 1445 REAR MOUNT BOOM MOWER ...