
MAINTENANCE
RMB 1445 11/10
Maintenance Section 5-3
© 2010 Alamo Group Inc.
MAINTENANCE
PTO SHAFT
Regularly check the PTO guards for damage and ensure the anti rotation chains are in place and that their
anchor points are in good condition.
PTO LUBRICATION
Lubricate the shaft at the points shown below at the intervals indicated using N.L.G.I. #2 Grease.
Make sure the PTO shield, integral driveline shields, and input shields
are installed when using PTO-driven equipment. Always replace any
shield if it is damaged or missing.
(S3PT-8)
KEEP AWAY FROM ROTATING ELEMENTS to prevent entanglement
and possible serious injury or death.
(SG-24)
Summary of Contents for RMB 1445
Page 8: ......
Page 9: ...Safety Section 1 1 SAFETY SECTION ...
Page 38: ......
Page 39: ...Introduction Section 2 1 INTRODUCTION SECTION ...
Page 43: ...Assembly Section 3 1 ASSEMBLY SECTION ...
Page 54: ......
Page 55: ...Operation Section 4 1 OPERATION SECTION ...
Page 101: ...Maintenance Section 5 1 MAINTENANCE SECTION ...
Page 110: ...MAINTENANCE RMB 1445 11 10 Maintenance Section 5 10 2010 Alamo Group Inc MAINTENANCE ...
Page 111: ......
Page 114: ...RMB 1445 11 10 P N 50068815C Printed U S A RMB 1445 REAR MOUNT BOOM MOWER ...