
ASSEMBLY
RMB 1445 11/10
Assembly Section 3-7
© 2010 Alamo Group Inc.
ASSEMBL
Y
DRIVELINE ATTACHMENT
Before starting assembly, make certain that all paint, dirt, and grease are removed from gearbox shaft. To ease
assembly apply a light coat of grease to splines and assemble. Do not assemble a driveline without a shield.
Entanglement in rotating shafts can kill.
Measure distance shown between the tractor PTO Shaft and mower pump shaft. The driveline must collapse to
3” less than the measured dimension. It may be necessary to shorten the shaft. See Maintenance Section for
procedures.
NOTE: The dimensions measured may vary on different tractors. If moving the mower to a different tractor,
complete the measurement step again. If it is necessary to shorten the shaft, there must be at least 6” of shaft
overlap in the operating position.
Fit PTO shaft and attach torque chain to prevent the shaft guard from rotating. (Figure Asm-B-0094)
Raise the stand legs into the work position and secure. (Figure Asm-B-0095)
Summary of Contents for RMB 1445
Page 8: ......
Page 9: ...Safety Section 1 1 SAFETY SECTION ...
Page 38: ......
Page 39: ...Introduction Section 2 1 INTRODUCTION SECTION ...
Page 43: ...Assembly Section 3 1 ASSEMBLY SECTION ...
Page 54: ......
Page 55: ...Operation Section 4 1 OPERATION SECTION ...
Page 101: ...Maintenance Section 5 1 MAINTENANCE SECTION ...
Page 110: ...MAINTENANCE RMB 1445 11 10 Maintenance Section 5 10 2010 Alamo Group Inc MAINTENANCE ...
Page 111: ......
Page 114: ...RMB 1445 11 10 P N 50068815C Printed U S A RMB 1445 REAR MOUNT BOOM MOWER ...