OPERATION
HT625H 03/19
Operation Section 4-12
© 2019 Alamo Group Inc.
OPERA
T
ION
8.2 Hay Tedder Pre-Operation Inspection/Service
Before each use, a complete inspection and service is required to ensure the hay tedder is in a good and safe
working condition. Damaged and/or broken parts should be repaired and/or replaced immediately. To ensure
the hay tedder is ready for operation, conduct the following.
OPS-HT-0020
8.1 Tractor Pre-Operation Inspection/Service
Refer to the tractor operator’s manual to ensure a
complete pre-operation inspection and scheduled
service is performed according to the
manufacturers recommendations. The following
are some of the items that require daily service and
inspection:
•
Tire condition/air pressure
•
Wheel lug bolts
•
Steering linkage
•
PTO shield
•
SMV sign is clean and visible
•
Tractor’s lights are clean and functional
•
Tractor Seat belt is in good condition
•
Tractor ROPS is in good condition
•
ROPS is in the raised position
•
No tractor oil leaks
•
Radiator free of debris
•
Engine oil level and condition
•
Engine coolant level and condition
•
Power brake fluid level
•
Power steering fluid level
•
Fuel condition and level
•
Sufficient lubrication at all lube points
•
Air filter condition
OPS-U-0030
The operator’s manual and safety signs affixed on
the unit contain important instructions on the safe
and proper use of the equipment. Maintain these
important safety features on the implement in good
condition to ensure the information is available to
the operator at all times.
•
Ensure the manual canister is secured to the
equipment with the operator’s manual inside.
•
Ensure all safety signs are in place and legible.
Replace missing, damaged, and illegible
decals.
OPS-U- 0011
Summary of Contents for HT625H
Page 5: ...Safety Section 1 1 SAFETY SECTION...
Page 20: ...SAFETY HT625H 03 19 Safety Section 1 16 2019 Alamo Group Inc SAFETY Decal Description...
Page 21: ...SAFETY HT625H 03 19 Safety Section 1 17 2019 Alamo Group Inc SAFETY...
Page 22: ...SAFETY HT625H 03 19 Safety Section 1 18 2019 Alamo Group Inc SAFETY...
Page 24: ......
Page 25: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 30: ......
Page 31: ...Assembly Section 3 1 ASSEMBLY SECTION...
Page 40: ......
Page 41: ...Operation Section 4 1 OPERATION SECTION...
Page 67: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Page 74: ...MAINTENANCE HT625H 03 19 Maintenance Section 5 8 2019 Alamo Group Inc MAINTENANCE...
Page 76: ...HT625H SOM 03 19 P N 50076700 Printed U S A HT625H HAY TEDDER...