background image

Adjustment values for the temperature sensor

The temperature of the oil is monitored by a temperature sensor TSA
which is fitted to the cover on the B-side.

Depending on the temperature of the oil, first a warning is emitted,
then the pump will eventually be switched off when the temperature
of the oil has reched the corresponding temperature values.

TSA

Oil

T

Warning

T

Switch off

YLC 250 B

80°C

90°C

Connecting Lines/ Pipes

In case the suction line is equipped with a shut-off valve:

u

Connect the suction line

l

Connect the discharge line

l

Make sure that cooling air inlets and outlets are not covered or
obstructed and that the cooling air flow is not affected adversely in
any other way

Filling up with Oil

The gears and the bearings are oil-lubricated.

In case the pump has been preserved with conservation oil:

u

Drain any remaining conservation liquids

CAUTION

Operation without oil will destroy the vacuum pump within a short
period of time.

Prior to commissioning the vacuum pump, make sure that oil is filled
in.

The vacuum pump can be delivered with or without oil.

In case the pump is delivered filled with oil, the oil used is PFPE oil.

Dispose of the used oil according to applicable environmental
protection regulations.

NOTE

: The quantity of oil given in these operating instructions serves

as a guideline only. Check the oil level with the help of the oil sight
glasses (OSG, 220/ 222) on the vacuum pump.

CAUTION

In case the vacuum pump has been treated with conservation oil:

Synthetic oils (except for oils based on poly-olefin) are incompatible
with mineral oils and conservation oils.

Risk of foam building leading to the destruction of the vacuum
pump.

CAUTION

Oil may only be filled in through oil filler holes (OFP, 250/ 260)

Remove oil filler plugs (OFP, 250/ 260) only if the vacuum pump
and the primary pump are at a complete standstill.

The vacuum pump must only be operated with the oil filler plugs
(OFP, 250/ 260) firmly tightened up.

l

Remove oil filler plugs (OFP, 250/ 260)

l

Fill in the relevant quantity of oil as detailed in the table “Oil
Quantity”

l

Make sure that the oil level at the gears and bearings is in the
target circle of the oil sight glasses

l

Make sure that the seals of the filler plugs (OFP, 250/ 260) are not
damaged and positioned correctly. Replace seals if damaged.

l

Refit the oil filler plugs (OFP, 250/ 260)

l

Switch on the vacuum pump

In case the suction line is equipped with a shut-off valve:

u

Close the shut-off valve

In case the suction line is not equipped with a shut-off valve:

l

Cover the suction flange (IN) with a rubber mat

l

Let the vacuum pump run for a few minutes

l

Switch off the vacuum pump and wait for a few minutes

l

Make sure that the oil level at the gears and bearings is in the
target circle of the oil sight glasses

l

Make sure that the vacuum pump is switched off and cannot
accidentally be switched on again.

u

Top-up with oil

In case the suction line is equipped with a shut-off valve:

u

Open the shut-off valve

In case the suction line is not equipped with a shut-off valve:

u

Remove the rubber mat from suction flange and connect the
suction line

Saving the operating parameters

As soon as the vacuum pump is working under normal conditions after
being switched on:

l

Measure the working current of the motor and save it as reference
value for all future maintenance and repair work

Recommendations on operation

Application

CAUTION

In case of disrespect of the above, risk of damage or destruction of
the vacuum pump and adjacent system components!

Risk of Injury!

The vacuum pump has been designed for use in the semiconductor
industry under clean room conditions. The roots pumps can only be
used in conjunction with primary pumps in vacuum systems. They can
be used to draw gases and mixtures of gases.

The end user must make sure that the system complies with national
and international safety regulations and that all safety measures are
followed, when drawing toxic, inflammable and/ or explosive gases.

Max. permissible number of startings per hour: 6.

These pumps are not suitable for the drawing of explosive mixture.
Before using the vacuum pump with aggressive gases, imperatively
contact your local Busch Agency.
Do not use the pump for another process without general overhaul, as
gases or products can remain inside the pump.

Installation and Commissioning

Page 8

MAX

MIN

MAX

MIN

MAX

MIN

Summary of Contents for WY 4500 C

Page 1: ...Installation and Operating Instructions Vacuum pumps WY 4500 C Ateliers Busch S A Zone industrielle 2906 Chevenez Switzerland 0870565696 170707 Original instructions Subject to change without notice ...

Page 2: ...he bearings 10 Checking the magnetic plug from the rear lubrication circuit of the motor bearing 10 Filling in fresh oil for the gears and the bearings 11 Overhaul 11 Removal from Service 11 Temporary Removal from Service 11 Recommissioning 11 Dismantling and Disposal 12 Exploded drawing 13 Spare parts 14 Gasket kit 14 Full service kit 14 Oil 15 Oil type 15 Technical Data 16 Troubleshooting 17 EU ...

Page 3: ...ses after the vacuum pump has been switched off The vacuum pump is intended for installation in a potentially non explosive environment Max permissible number of startings per hour 6 The vacuum pump is thermally suitable for continuous operation The vacuum pump is capable of holding end pressure Principle of operation The Roots vacuum pumps operate according to the approved principle of the Roots ...

Page 4: ...evertheless residual risks may remain These operating instructions and the pump itself inform about potential hazards where appropriate Safety instructions can be detected through the keywords DANGER WARNING and CAUTION as follows DANGER Disregard of this safety instruction will always lead to accidents with fatal or serious injuries WARNING Disregard of this safety instruction may lead to acciden...

Page 5: ...r cardboard foam evaporate a substance that condenses in molecular thickness on the packed good and by its electrochemical properties effectively suppresses corrosion on metallic surfaces However VCI products may attack the surfaces of plastics and elastomers Seek advice from your local packaging dealer VCI packaging ensures good protection against corrosion for a few years even in the most extrem...

Page 6: ...p in the suction line so that condensates can be drained from the suction line l Make sure that the suction line does not contain foreign matter e g welding slag Discharge connection CAUTION Do not put hands into the outlet aperture Risk of body damage The following guidelines for the discharge line do not apply if the drawn air is discharged into the environment directly at the vacuum pump l Make...

Page 7: ...nnection 15 kW CAUTION When connecting up the wires into the terminal box please make sure the tightening torque of 3 Nm is adhered to and check with a calibrated torque wrench Nuts M6 Three phase motor connection Star star connection Low voltage Star connection High voltage Thermoswitch connection CAUTION Operation in the wrong direction of rotation can destroy the vacuum pump within a very short...

Page 8: ...hat the oil level at the gears and bearings is in the target circle of the oil sight glasses l Make sure that the seals of the filler plugs OFP 250 260 are not damaged and positioned correctly Replace seals if damaged l Refit the oil filler plugs OFP 250 260 l Switch on the vacuum pump In case the suction line is equipped with a shut off valve u Close the shut off valve In case the suction line is...

Page 9: ...tally be switched on again Any dismantling of the pump must be executed by qualified personnel only Before dismantling the end user of the vacuum pump must fill in a Certificate about Absence of Danger which will inform about possible risks and dangers and corresponding measures Without this document duly filled in and signed by an authorised person the pump cannot be dismantled CAUTION During ope...

Page 10: ...e less than 500 operating hours Extremely short life times indicate malfunctions see Troubleshooting or unsuitable operating conditions If there is no experience available regarding the oil life under the prevailing operation conditions it is recommended to have an oil analysis carried out every 500 operating hours and establish the oil change interval accordingly thereafter Oil Change WARNING Dra...

Page 11: ...commended that any dismantling of the vacuum pump going beyond the scope of description in this manual should be carried out by specially trained Busch service personnel only CAUTION Risk for the operating safety after improper work on the vacuum pump Risk of explosion Approval for operation of the pump will be void Any dismantling of the vacuum pump going beyond the scope of what is described in ...

Page 12: ...nation must be documented in a declaration of decontamination Declaration of Decontamination which can be downloaded from www buschvacuum com Used oil and condensates must be disposed of separately in compliance with applicable environmental regulations l Drain the oil u Dispose of the used oil in compliance with applicable regulations l Make sure that all materials and components that must be tre...

Page 13: ...Exploded drawing Page 13 Exploded drawing ...

Page 14: ... 633 223 O ring 1 0486 000 633 241 O ring 1 0486 000 647 243 O ring 1 0486 000 647 245 O ring 1 0486 000 647 247 O ring 1 0486 000 647 256 O ring 4 0486 000 647 384 O ring 1 0486 000 686 523 O ring 2 0486 565 397 556 O ring 1 0486 000 761 603 O ring 4 0486 000 711 611 Sealing ring 1 0482 545 177 Full service kit These full service kits contain all relevant gasket kits as well as the wear and tear ...

Page 15: ...nto contact with the oil must be cleaned Make sure that the bearings are lubricated prior to reassembly l Make sure that the oil type corresponds to specifications Busch YLC 250 B n art 0831 000 054 0 5 l 1 kg WARNING The use of chemically contaminated or polluted oil can lead to hazardous pump conditions which could cause personal injury Oil quantity The quantity of oil specified in the following...

Page 16: ...al displacement 50 Hz 60 Hz m3 h 4500 5400 Max differential pressure according to DIN 28426 50 Hz 60 Hz hPa mbar 30 30 Nominal motor rating 50 Hz 60 Hz kW 15 15 Nominal motor speed 50 Hz 60 Hz min 1 3000 3600 Weight approx kg 600 Technical Data Page 16 ...

Page 17: ...Reaching operational pressure takes too long In case an inlet filter is installed on the suction side The filter on the suction flange is partially clogged Clean or change the filter Partial clogging or blockage in suction or discharge lines Remove foreign particles Suction or discharge lines too long or too small diameter Use larger diameter lines Internal parts worn or damaged Have the vacuum pu...

Page 18: ...Check the proper connection of the wires against the wiring diagram Tighten or change the connections Wrong oil quantity unsuitable oil type Use one of the recommended oils in the correct quantity see Oil Oil change see Maintenance Foreign particles in the vacuum pump Seized bearings Have the vacuum pump repaired Busch service The vacuum pump is very noisy Defective bearings Have the vacuum pump r...

Page 19: ...le rotational speed and correct Too much gear oil in the housing Fill in oil only to the target circle of the oil sight glass while the blower is switched off Ambient temperature too high Increase ventilation of the machine room increase rotational speed ventilation of motor Blockage of the suction inlet or filter Clean suction inlet and clean or change filter Excessive wear of rotors and conseque...

Page 20: ......

Page 21: ...and following the standards Standard Title of the standard EN ISO 12100 2010 Safety of machinery Basic concepts general principles of design EN ISO 13857 2008 Safety of machinery Safety distances to prevent hazard zones being reached by the upper and lower limbs EN 1012 1 2010 EN 1012 2 1996 A1 2009 Compressors and vacuum pumps Safety requirements Part 1 and 2 EN ISO 2151 2008 Acoustics Noise test...

Page 22: ...Note ...

Page 23: ...Note ...

Page 24: ... Majang myun Icheon si Gyunggi do 467 813 Republic of Korea Phone 82 31 645 2700 Fax 82 31 631 2898 e mail busch busch co kr Malaysia Busch Malaysia Sdn Bhd 4 6 Jalan Taboh 33 22 Seksyen 33 Shah Alam Technology Park 40400 Shah Alam Selangor Darul Ehsan Phone 60 3 5122 2128 Fax 60 3 5122 2108 e mail busch busch com my Mexico Busch Vacuum Mexico S de R L de C V Tlaquepaque 4865 Los Altos Monterrey N...

Reviews: