5 | Installation
10 / 28
0870573103_RA0160-0302D_O2_-0001_IM_en
• Make sure that enough space remains for maintenance work.
• Make sure that the machine is placed or mounted horizontally, a maximum of 1° in
any direction.
• Check the oil level, see
Oil Level Inspection [
}
18]
.
• Make sure that all provided covers, guards, hoods, etc. are mounted.
Version with water-oil heat exchanger:
• Make sure that the cooling water complies with the requirements, see
Cooling
Water Connection (Optional) [
}
11]
.
If the machine is installed at an altitude greater than 1000 meters above sea level:
• Contact your Busch representative, the motor should be derated or the ambient
temperature limited.
5.2 Connecting Lines / Pipes
• Make sure that the connection lines cause no stress on the machine‘s connection; if
necessary use flexible joints.
• Make sure that the line size of the connection lines over the entire length is at least as
large as the connections of the machine.
In case of very long connection lines it is advisable to use larger line sizes in order to
avoid a loss of efficiency. Seek advice from your Busch representative.
5.2.1 Suction Connection
WARNING
Unprotected suction connection.
Risk of severe injury!
• Do not put hand or fingers in the suction connection.
NOTICE
Intruding foreign objects or liquids.
Risk of damage to the machine!
If the inlet gas contains dust or other foreign solid particles:
• Install a suitable filter (5 micron or less) upstream from the machine.
Connection size:
– G2
Depending on the specific order, other connection dimensions may apply.
If the machine is used as part of a vacuum system:
• Busch recommends the installation of an isolation valve in order to prevent the oil
from flowing back to the vacuum system.