4 | Storage
6 / 40
0870220060_MH0018A_-0001_IM_en
4
Storage
• Seal all apertures with adhesive tape or reuse provided caps, if not connected to a sys-
tem.
If the machine is to be stored for more than 2 months:
• Make sure that the inside of the process chamber will be kept dry and dust free at
ambient temperature.
• Before restarting the machine after a long period of machine shutdown, it is re-
commended to maintain as described in chapter
.
5
Installation
5.1 Installation Conditions
WARNING
Hydrogen leaks.
Risk of severe injury!
Risk of explosion!
• Perform a hydrogen leak test of the entire system in order to fulfil a maximum leak
rate of 10 Ncm
3
/h.
• Please refer to the Commission Regulation (EU) No 406/2010 and the Regulation (EU)
No 79/2009.
• Make sure the machine is vented enough or monitored by a hydrogen sensor.
• Make sure that no excess pressure of more than 1.8 bar(a) reaches the machine inlet.
NOTICE
Use of the machine outside of the permitted installation conditions.
Risk of premature failure!
Loss of efficiency!
• Take care that the installation conditions are fully complied with.
Fixing points
Summary of Contents for MH 0018 A
Page 35: ...T V Certificate 13 0870220060_MH0018A_ 0001_IM_en 35 40 13 T V Certificate...
Page 37: ...Note...
Page 38: ...Note...
Page 39: ...Note...