Electrical connection/ Checks
Make sure that the regulations of the Electromagnetic
Compatibility Directive 2014/30/EU as well as standard EN norms,
safety directives and especially local and national regulations are
observed (this is the responsibility of the manufacturer of the
system into which the vacuum pump is integrated according to the
Declaration of Conformity)
Make sure that the main power supply corresponds to the data on
the nameplate of the motor
Make sure that an overload cut-out according to EN 60204-1 is
provided for the motor
Make sure that the drive of the vacuum pump is not disturbed by
any electric or electromagnetic interferences. If you have any
doubts, contact your Busch representative
Installation
Mounting
Make sure that the “Necessary installation instructions” are
followed
Fasten or install the pump at its final installation site
Electrical connection
WARNING
Risk of electrocution, risk of damage.
Electrical installation must be performed by a suitably qualified
electrician who knows and follows the following regulations:
-
IEC 364 or CENELEC HD 384 or DIN VDE 0100,
-
IEC Report 664 or DIN VDE 0110,
-
VBG 4 or corresponding national regulations on accident
prevention
Power wiring connection
Connect the main cable on the socket, according to the following
figure
CAUTION
If the vacuum pump is operated with a motor that turns in the
wrong direction, it can be destroyed, even if this is the case for only
a short moment.
Make sure that the vacuum pump is connected correctly before
switching it on.
Determine rotation sense of the motor by using a measure tool or
putting a rubber plate on the inlet.
Press on the start button
Make sure that the vacuum pump draws in
If not, push the Emergency stop button
If the direction of rotation has to be changed:
Exchange two of the three feeder leads
Equipment connections (with options)
The information concerning the use of the Busch PLC and the Busch
LCD can be found in the Operation and Maintenance manual (Art.No.
0870758077).
Connection of the lines/ pipes
Connect the intake lines
Connect the discharge lines
Make sure that all caps, safeguards and similar covers are mounted
Make sure that the inlet and outlet for the cooling air are not cover
ed or closed and that the flow of cooling air is not impaired in any
way
Oil filling
The COBRA BC 0601 G vacuum pumps are generally dispatched with oil
already in the vacuum pump. Before vacuum pump first startup, control
the oil level. In the event of absence of one or the other of these
lubricants, please carry out the filling (see the chapter “Oil types” for
information on the recommended oils).
Installation and Commissioning
Page 12
BC 0601 G
0870235875
(En)
1
2
3
4
5
6
LCD serial wiring (RJ45), LCD1
LCD serial wiring (RJ45), LCD2
PC serial wiring (9 poles) (option)
USB connection
Customer Network, Communication modbus RTU RS 232
Ethernet network connection (Busch Monitoring System)
(option)
Interface connection (50 poles) (option)
PID Interface (9 poles) (option)
7
8
Power connector on vacuum pump rear side
Power wiring 4 poles
1
Phase L1
2
Phase L2
3
Phase L3
4
Ground
7
8
6
5
4
3
2
1
Lock
Phase 1
Phase 2
Phase 3
Ground
Summary of Contents for COBRA BC 0601 G
Page 22: ...Note ...
Page 23: ...Note ...