
11
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
- Boiler room must allow for continuous
access of air necessary to maintain
combustion;
- Boilers must not be placed in inhabitable
rooms;
- All boiler rooms must have correctly
calculated vent depending on the boiler
output. The vent must be protected by
means of a net or grate.
The size of the vent is calculated according
to the formula:
А = 6,02
*Q
- where:
А
– area of the vent in cm,
Q
– boiler output in kW
- Remove the packaging without polluting
the environment
- Observe
building
supervision
instructions, in particular the existing
Ordinance on combustion devices and
storage of combustion materials, on
building requirements applicable to
installation sites and on ventilation;
- The boiler must be placed on a
foundation whose surface area is larger
than the base of the heating boiler
according to diagram 1;
- The boiler must be placed in a position
which allows for the easiest possible
cleaning and servicing;
- Installation must be carried out
according to installation diagram 1
which shows the boiler housing;
- No objects made of flammable materials
or liquids may be placed on/near the
boiler;
6.2. Check door tightness
Open boiler doors.
Place paper strips on the four sides of the
doors and close leaving part of the strips
protruding outside.
Pull the paper strips. If the strips tear
upon pulling, doors seal tightly.
Caution! Inadequate adjustment
of the hinges may result in air
being sucked in through the
doors and the boiler burning
uncontrollably.
7. SETUP OF THE HEATING BOILER AND
BURNER
7.1. Connecting the boiler to a chimney
Boiler-to-chimney
connection
must
always comply with the existing standards
and rules.
The chimney must provide
sufficient draught for evacuation of the
smoke under any conditions.
Diagram 4. Boiler size and chimney
parameters