77
107774-01- 9/17
Figure 9.6: Piping Method #2 - Direct Connection of Boiler to Heating System
NOTICE
Where it is not possible to install a separate boiler loop, the system circulator must be sized to ensure that
the flow through the boiler stays within the defined parameters to prevent overheating when the boiler is
fired at it’s full rated input. Install a flow meter to measure the flow, or fire the boiler at full rate and ensure
the boiler delta T does not exceed 35°F (19°C).
Method 2: Direct Connection to Heating System (Generally NOT Recommended)
In some relatively rare cases it may be possible to connect this boiler directly to the heating system as is done with
conventional boilers (Figure 9.6). If this is done, the flow rate through the boiler will equal the flow rate through the system.
The flow rate through the system must therefore always remain within the limits shown in Table 9.1. For this reason, the
pressure drop through the entire system must be known.
This method is generally not recommended because it is often very difficult to accurately calculate the pressure drop
through the system. In replacement installations, it may be impossible to get an accurate measurement of the amount of
piping and number of fittings in the system. In addition, if the system is zoned, the system flow may drop well below the
minimum required when only one zone is calling for heat.
The one advantage to this method is its installation simplicity. It may make sense to use this method when the boiler is to be
installed with a new single zone system having a low-pressure drop.
Figure 9.7 shows the performance curve for the pump in each boiler model, taking into account the pressure drop through
the boiler’s heat exchanger and internal piping. These curves therefore show the flow that can be achieved through the boiler
as a function of the pressure drop through the connected piping. Calculation of the system pressure drop must be performed
by someone having familiarity with pressure drop calculations, such as an HVAC engineer.
IX. System Piping
(continued)
Summary of Contents for K2WTC
Page 81: ...81 107774 01 9 17 X Domestic Hot Water Piping continued Figure 10 1 Domestic Hot Water Piping ...
Page 88: ...88 107774 01 9 17 XI Wiring continued XI Wiring continued ...
Page 89: ...89 107774 01 9 17 Figure 11 7 Internal Wiring Connections Diagram XI Wiring continued ...
Page 100: ...100 107774 01 9 17 Lighting and Operating Instructions XII Start Up and Checkout continued ...
Page 141: ...141 107774 01 9 17 XVI Repair Parts continued ...
Page 144: ...144 107774 01 9 17 XVI Repair Parts continued ...
Page 147: ...147 107774 01 9 17 XVI Repair Parts continued ...
Page 149: ...149 107774 01 9 17 XVI Repair Parts continued ...
Page 151: ...151 107774 01 9 17 XVI Repair Parts continued 120 121 122 123 124 125 126 127 ...
Page 158: ...158 107774 01 9 17 SERVICE RECORD DATE SERVICE PERFORMED ...
Page 159: ...159 107774 01 9 17 SERVICE RECORD DATE SERVICE PERFORMED ...