
9-2
9.1 Start-Up
Checklist
9.1.1 Mechanical
Setup
1. Locate appropriate spray rail into the floor guides and secure in place with foot lock
located under spray box.
2. Locate applicator cart into position and lock wheels to secure.
9.1.2 Electric
1. Connect “Rail ” cord from cart to spray rail.
Caution: Do not force as pin damage may
occur.
2. Connect power cord from cart to appropriate power drop.
3. Connect encoder cable from spray rail to conveyor on the non-operator side.
Caution:
Do not force as pin damage may occur.
4. Connect pressure switch cable.
Caution: Do not force as pin damage may occur.
5. Connect level sensor cable.
Caution: Do not force as pin damage may occur.
6. Connect both ethernet cables from conveyor to applicator cart, located under main
electrical enclosure.
7. Turn on main power located on the conveyor.
8. Turn on the local power located on the cart electrical enclosure.
9.1.3 Pneumatic
1. Connect air line to spray rail.
Caution: Do not turn on air before connecting this line.
2. Connect air line to fill valve.
3. Connect main air line from conveyor to filter/regulator located on cart.
4. Turn on main air located on conveyor.
5. Turn on local filter/regulator located on the cart, verify 60 psi on gauge.
9.1.4 Product
Lines
1. Connect feed and return hoses from cart to spray rail manifolds,
connect the return hose to the lower front fitting on tank using the
reducer provided. (see picture at right).
2. Connect hose from bottom of tank (isolation valve) to the infeed
of the pump, using screen gasket (black) on either end of hose.
3. Connect fill hose from tote garlic line to fill valve on top of the
tank, if applicable to product.
4. Verify fill valve is installed correctly, A = Infeed & B = discharge
(see picture below).
B
A
Feed Hose
Connect return hose here.
Summary of Contents for 8830
Page 50: ...14 3...
Page 58: ...14 11 29 30 NOTE Item 31 not shown...
Page 60: ...14 13 NOTE Item 31 not shown 29 30...
Page 63: ...14 16...