9
Operating Instructions
Burco boilers are designed for continuous operation and should only be switched off for the purpose of
maintenance or emergency.
Boiler Overview
Boiler Overview
Before general use, please follow these important commissioning steps:
Ensure boiler is connected to the mains water supply.
Turn on the mains power and press and hold the power button
for 10 seconds. The boiler should begin
filling and heating.
Ensure boiler is set to
98˚C, fully drain the boiler contents from the tap and repeat.
Boiler should be fully
drained twice before general use.
Controller Set Up
On/Off Switch
Lift off lid for access
to descale cap
Controller Screen
Piping for connection
to potable water
Hot Water Tap
Water Filter Access
Drip Tray