background image

Connect the device only to the power
source indicated in the operating in-
structions or on the unit.

Run the power supply cable so that no
one can step on it and nothing can rest
on or against it. The cable is particular-
ly at risk in the area of the plug, the
socket and where it comes out of the
unit.

If you are not going to use the unit for
some time, remove the plug from the
socket.

6. Object intrusion

Take special care that no liquids or
objects get inside the unit through the
openings in the housing.

7. Repair in the event of damage

The machine must be repaired by qua-
lified persons. Never apply other
maintenance than given in the opera-
ting instructions.

8. Set up

Set up the appliance in a suitable room.
A unit filled with chemicals must be
placed on chemical resistant floor or in
a safety tray. In case of overflow or
leakage look up the information in the
appropriate safety data sheets.

Do not allow chemicals to go into the
drain. The unit must not be used in the
residential area; keep away from child-
ren.

9. Appliance check

Close the drain valves before filling
the tanks. Use the machine only when
all tanks are filled with liquid. Other-
wise damage of the heating elements
and tanks will happen immediately.
Control the liquid level daily.

The temperature of the solution can
differ to the adjusted temperature.
Control the function of the thermostats
weekly by an external (glass) thermo-
meter.

10. Chemistry handling

Wear goggles and protective gloves
for all work. Pay attention on good
room ventilation. Avoid contact with
skin, eyes and mucous membranes.

Take off clothing soaked in caustic
substances immediately. Rinse splas-
hes on skin immediately with copious
amounts of water.

In the event of accidents or feeling un-
well always consult a doctor.

Bungard Elektronik GmbH&Co KG· · Rilke Str. 1 · D-51570 Windeck
Tel 02292 5036 · Fax 6175 · [email protected]

Compacta L30

Instructions for use

Plating line

Page 2

Summary of Contents for Compacta L30

Page 1: ...2 Safety warnings In your own interest pay attention to all safety warnings on the unit and in the operating instructions Follow the instructions on operation and use of the unit in every respect 3 Ventilation Wherever you put the unit always en sure there is sufficient ventilation An exhaust system may be necessary de pending on your local requirements 4 Heat and moisture To prevent fire or the r...

Page 2: ...ation in the appropriatesafety data sheets Do not allow chemicals to go into the drain The unit must not be used in the residential area keep away from child ren 9 Appliance check Close the drain valves before filling the tanks Use the machine only when all tanks are filled with liquid Other wise damage of the heating elements and tanks will happen immediately Control the liquid level daily The te...

Page 3: ...n and can be heated up to 70 C The second hea ter can be used up to 50 C 3 Electroplating tank Approx internal dimensions 400 x 275 x 400 mm D x W x H capacity approx 30l Draining by means of an attached tap in the bottom The tank is equipped with an air bubble pipe for liquid agitation 4 Control section Two thermostates with switch one air pump 400 l h with switch main switch 5 el Timer Conveyor ...

Page 4: ...T Room temp Bath 3 Activator Catalyst RT Bath 4 Salt remover 45 C Bath 5 Sparebath Bath 6 Electroplate RT 3 3 Check if the heater switch lamp turns off automatically at preset tem perature 4 Check again after 4 5 hours if not hing is leeking 5 Startair agitation for plating bath 6 Start mechanical agitation and vary agitation speed 7 If all steps of this test are passed without problems switch off...

Page 5: ... that reason fix a clean and well brushed PCB of 200 x 300 mm in a board holder Then mount the holder onto the agitation rod and screw it carefully Start air agitation Start mechanical bath agitation Adjust agitation speed to about value 4 on the scale Activate rectifier and adjust a current of 1 A dm 2 sides x 6 dm x 1 A dm 12 A Run the bath accor ding to items 8 to 12 of the Plating System Step ...

Page 6: ... Note al low 0 05 to 0 1mm extra diameter for the drill bits because copper plating in the holes will reduce the effective diameter After that use one of our brushing ma chines RBM series for scrub clean ing washing and drying if no bru shing machine available brush and clean manually 3 Fix the cleaned and deburred board in the COMPACTA 3 finger board holder and fix it on the leftmost con veyour a...

Page 7: ...ey can be easily replenis hed by simply adding the appropriate product See the instructions on the following Plating System Step descrip tions Missing replenishment will spoil Bath maintenance The Analysis procedures in the Plating System Step descriptions arefor expert use only This is to say the bathes maintain stable and working also wit hout analyses only by replenishment The Analysis procedur...

Page 8: ......

Page 9: ......

Reviews: