Before installation
4
SKS 4.0 Series - Flat roof and wall mounting - We reserve the right to make any changes due to technical modifications.
8
4
Before installation
4.1
General notes
Make yourself familiar with the on-site conditions and lo-
cal regulations before commencing the installation.
Check
z
the delivery for completeness and perfect condition.
z
the roof structure for sufficient strength and possible
damage (e.g. leaks).
z
the building height and determine the type of fixings
required for the flat roof supports (see Chapter 5.3
"Stabilising the flat roof supports", page 22).
z
the optimum arrangement of the solar collectors.
Take the solar radiation into consideration
(angle of incidence, southerly orientation). Avoid the
shade of high trees or structures and match the coll-
ector array to the shape of the building (e.g. flush with
windows, doors, etc.).
z
the stability of the support surface. Remove gravel or
similar material.
USER NOTE
It is recommended that the services of a
roofing company, who are fully experi-
enced in working on roofs and will be awa-
re of the risk of working at height, are
considered.
Fig. 1
General overview of collector pair — flat roof mounting
Fig. 2
General overview of collector pair — wall mounted
installation
63043970.02-1.SD
63043970.02-1.SD
63043970.05-1.SD
USER NOTE
Only use OEM components and replace
any faulty parts immediately.
USER NOTE
Let a professional roofer carry out all diffi-
cult roof repairs, particularly weather-proo-
fing of bitumen layers.