Logano GB125 BE US/CA - Subject to technical modifications.
62
Index
A
Ambient conditions
.......................................................
10
B
B-kit components
............................................................
7
B-kit Installation
............................................................
22
Boiler output
..................................................................
8
Boiler type
.....................................................................
8
Burner, notes on commissioning
.....................................
33
C
Check the manual reset high limit (STB)
...........................
34
Checking for leaks (heating water)
..................................
24
Commissioning
.............................................................
31
log
..........................................................................
35
Connecting power supply
..............................................
29
Connecting the fuel supply
.............................................
25
Connections
..................................................................
8
Correcting burner faults
.................................................
49
D
Dimensions
....................................................................
8
Dirt trap
.......................................................................
22
E
Examples of Installations
................................................
50
F
Fuel, operating conditions
..............................................
10
H
Heat exchanger baffles, checking position
........................
32
Heat exchanger baffles, removing
....................................
38
Heat exchanger heater flue, cleaning
...............................
38
Heating circuits, multiple
................................................
50
Heating system emergency shut-off switch
.......................
36
I
Installation diagram
.......................................................
23
Installation of drain valve
................................................
23
Installation room
...........................................................
10
Installing outer casing panels
..........................................
30
Installing strain relief
......................................................
30
Installing the burner door jacket
......................................
30
Installing the control panel
..............................................
27
Installing the temperature sensor assembly
.......................
28
L
Line voltage
.................................................................
10
Log, commissioning
......................................................
35
Logs, inspection and maintenance
...................................
46
M
Main power switch
........................................................
36
Main shut-off valve
........................................................
32
Maintenance, regular
.....................................................
37
Mounting the adjustable feet
...........................................
16
O
On-off switch
...............................................................
36
Operating conditions
.......................................................
9
P
Permissible operating pressure
.........................................
8
Power supply
...............................................................
10
Pressure gauge/thermometer
...................................
31
,
44
Pressure test port
.........................................................
33
R
Rated heat output
...........................................................
8
Removing burner door panel
...........................................
12
Removing the boiler cover
..............................................
27
Replacing sealant rope
..................................................
38
Reversing boiler door
....................................................
15
Reversing the burner door
..............................................
15
S
Safety instructions
..........................................................
3
Safety valve
......................................................
22
,
24
,
32
Scope of delivery
............................................................
7
Shutting down
..............................................................
36
Site test pressure
...................................................
10
,
24
Spare parts lists
...........................................................
53
Supply temperature
.........................................................
8
T
Technical specifications
...................................................
8
Thermometer/pressure gauge
...................................
31
,
44
Topping up
..................................................................
44
Transporting with boiler trolley/sack truck
.........................
13
Troubleshooting
............................................................
49
W
Wall clearances
............................................................
14
Water quality
................................................................
10
Wet cleaning
................................................................
39