5
Installing the boiler
Logano GB125 BE US/CA - Subject to technical modifications.
28
B
Remove the top cover of the control panel.
– Unscrew the cover screws [1].
B
Secure the control panel with self-tapping screws [2].
Fig. 25 Removing the cover
1
Cover screws
2
Self-tapping screws
5.8.2
Installing the temperature sensor assembly
B
Feed the capillary tubes and the sensor lead [2]
through the cable entry in the front boiler top panel [1]
to the sensor well [3].
B
Roll up surplus capillary tube and sensor lead length
and place on top of the thermal insulation.
B
Feed the burner cable [4] through the cable entry in the
front boiler top panel [1] to the control panel.
B
Connect the burner cable [4] to the control panel as
indicated by the terminal markings.
Fig. 26 Routing and connecting cables
1
Cable entry in the front boiler cover
2
Capillary tube and sensor cable
3
Sensor well
4
Burner cable
1
2
7 747 019 141-22.1RS
CAUTION:
Risk of damage to system!
Capillary tubes can get damaged from
severe kinking or sharp burrs.
B
Route capillary tubes carefully, avoiding
bending them excessively