5
Boiler installation
Logano GB125 BE US/CA - Technical specifications are subject to change without prior notice.
25
5.4.2
Installation of boiler drain (included in B-Kit)
V
Seal boiler drain to connection EL.
Fig. 17 Installation of boiler drain
RK
Return
EL
Drain
5.4.3
Installation of system components
See the installation diagram for installation of the heating
system components.
For more installation examples refer to Chapter 10,
page 51.
Fig. 18 Installation diagram
1
Pressure relief valve
2
Pressure/temperature gauge
3
Ball valve
4
Air eliminator (in main supply)
5
Heating pump
6
Flow check valve (back flow preventer)
7
Expansion tank
8
Automatic feed valve
9
Flow check valve (back flow preventer)
10
Purge station
11
Water supply
VK
Supply
EL
Drain
RK
Return
Install a fill connection in the supply piping to
the boiler.
7 747 019 141-15.1RS
RK
EL
Caution:
Risk of system faults from exces-
sive flue gas temperature.
The boiler drain connection (EL) must never
be used for any other purpose than to drain
the boiler heat exchanger.
For draining of the secondary heat exchanger
system, install a boiler drain at the lowest
point of the piping.