32
We reserve the right to make any changes due to technical modifications!
Installation, Operation and Maintenance Manual Sealed Combustion Gas Boiler Logano GA244 • Issue 02/2004
Buderus Heiztechnik GmbH • http://www.heiztechnik.buderus.de
Placing the Boiler in Operation
11
11.3 Shut off of Gas Supply
1.
Set thermostat to its lowest setting.
2.
Turn off all electric power to the appliance if service
is to be performed.
3.
Remove the front boiler jacket panel, see Fig. 22,
page 26.
4.
Turn gas control knob (Fig. 29,
Item. 1
) clockwise to
“OFF“. Do not force.
5.
Replace the front boiler jacket panel.