BÜCHI Labortechnik AG
Installation | 5
Operation Manual HydrolEx H-506
15/30
5
Installation
5.1
Before installation
NOTICE
Instrument damage due to switching it on too early.
Switching on the instrument too early after transportation can cause damage.
u
Climatize the instrument after transportation.
5.2
Installation site
The installation site must meet the following requirements:
Firm, level surface
Take into account the maximum product dimensions and weight. See Chapter 3.5
"Technical data", page 12
Fume hood
Make sure that cables / tubes can be routed safely
Own mains outlet socket
Own water tap (only when using a water jet pump)
NOTE
Make sure that the power supply can be disconnected at any time in an emergency.
5.3
Establishing electrical connections
NOTE
Observe the regulatory provisions when connecting the instrument to power supply.
4
Use external main switches (e.g., emergency off) in accordance with the stan-
dards IEC 60947-1 and IEC 60947-3.
4
Use additional electrical safety features (e.g., residual-current circuit breakers) to
comply with local laws and regulations.
The power supply must fulfill the following conditions:
1. Provide the mains voltage and frequency specified on the type plate of the instru-
ment.
2. Be designed for the load imposed by the instruments connected.
3. Be equipped with suitable fuses and electrical safety features.
4. Be equipped with a proper grounding.