13
RWA - Control Unit BCR
i
nstAllAtion
step
1:
C
onneCting
D
rives
anD
v
entilation
4 A
2 A
i
nstAllAtion
step
1:
BCR 2 A
und
BCR 4 A
c
onnecting
: d
rives
and
v
entilation
Connection of drives and ventilation:
BCR 2 A - 0101
and
BCR 4 A - 0101
04
reset
close
close
red: open
green: close
Drive 1
Drives 24V
GND
alarm
operation
fault
GND
GND
O
PEN
C
LOSE
REL
6 -
REL
6 -
REL
6 -
REL
7 -
REL
7 -
REL
7 -
com
n.c.
n.o.
com
n.c.
n.o.
button L2 -
button L2 -
LED -
LED -
LED -
Alarm
Fault
(inverted)
~ 1 s
=
=
-
+
+
-
1 2
Terminal
M1
M2
2
1
BU
BN
BN
BU
BK
BK
OG
BU
BN
Install
drive line end module
at the last drive
in the line!