Installation Instructions
© BTG 2019
User Manual CPM II2066en Rev.B
13
2.3 Mounting Instructions
1. Mount the CPM in the selected location by fastening the protective cover
to a flat surface. Use four suitable screws.
• See Fig 6 for recommended clearances.
• The top of the protective cover can be used as a holder for a
HART-terminal.
Tools required:
Screwdriver
Drilling machine
300
12"
200
8"
200
8"
Quick
Guide
Quick
Guide
200
8"
Fig 6 Recommended
clearances