www.bssindustrial.co.uk
32
Cylinder Schematic
Mechanical Diagram Y-Plan
8
7
1
2
9
3
5
6
10
4
11
Secondary
Return
Cold Main
Hot Water Outlet
Balanced Cold
Connection
High Limit
Stat
Boiler Prim. Flow
Boiler Prim. Return
Dual
Stat
1 Bronze Pump (not supplied)
2 Non Return Valve (not supplied)
3 Inlet Control Group
4 Temperature & Pressure Relief Valve
5 Isolation Valve (not supplied)
6 Exp. Vessel with Wall Bracket
7 2-port Zone Valve
8 3-port Valve (not supplied)
9 Drain Valve (not supplied)
10 Tundish
11 Heating Circ. Pump (not supplied, required with heat only boiler)
Summary of Contents for BOSS 100
Page 4: ...www bssindustrial co uk 4 ...
Page 31: ...Boss Direct Indirect Installation Guide 31 Cylinder Schematic Electrical Diagram S Plan ...
Page 33: ...Boss Direct Indirect Installation Guide 33 Cylinder Schematic Electrical Diagram Y Plan ...
Page 44: ...www bssindustrial co uk 44 48 Direct Indirect Mains Pressure Benchmark Checklist ...
Page 45: ...Boss Direct Indirect Installation Guide 45 49 Water Storage System Commisioning ...
Page 47: ...Boss Direct Indirect Installation Guide 47 Notes ...