Boss Direct / Indirect Installation Guide
23
Dimesions
170
200
250
300
400
500
Cylinder Height (A, mm)
1310
1490
1815
1600
1570
1900
Cylinder Diameter (B, mm)
540
540
540
600
710
710
Connection Height C (mm)
196
196
196
218
225
225
Connection Height D (mm)
246
246
246
268
275
275
Connection Height E (mm)
346
386
416
438
430
430
Connection Height F (mm)
446
486
516
538
615
615
Connection Height G (mm)
511
551
581
603
680
680
Connection Height H (mm)
576
616
646
668
745
745
Connection Height I (mm)
681
756
786
810
888
888
Connection Height J (mm)
826
906
1031
1053
1130
1130
Connection Height K (mm)
882
981
1271
1153
1180
1440
Connection Height L (mm)
1031
1211
1531
1333
1280
1640
Performance
170
200
250
300
400
500
Heat Up Time ΔT 50°C
15
17
21
25
30
38
1º Re-Heat time (70% draw off) 60L/min
10
12
15
18
21
28
1º Re-Heat time (70% draw off) 15L/min fr. cold 45ºC
15
17
21
25
30
38
Weight Empty (kg)
38
45
54
60
68
95
Weight Full (kg)
208
245
304
361
468
593
Prim. Coil Surf. Area (m
2
)
0.58
0.58
0.64
0.64
0.77
0.77
Prim. Coil Rating @ 60L/min (kW)
20
20
21
21
23
23
Prim. Coil Rat. @15L/m (kW, 80±2ºC)
20
20
21
21
23
23
Prim. Coil Press. Drop @ 15L/min (mbar)
45
65
76
76
88
90
Prim. Coil Press. Drop @ 60L/min (mbar)
42
42
65
65
76
76
Dedicated Solar Volume (ltr)
101
118
158
167
199
284
Solar Coil Surface Area (m
2
)
0.58
0.67
0.77
0.77
1.15
1.28
Solar Coil Rating @ 60L/min (kW)
19
21
23
23
25
28
Cont. Output @60ºC ΔT 50°C (L/hr)
382
382
401
401
440
440
Connection Sizes & Safety
170
200
250
300
400
500
Hot & Cold Conn. Ø (mm)
22
22
22
22
22
22
Primary Coil Connection Ø (mm)
22
22
22
22
22
22
Solar Coil Connection Ø (mm)
22
22
22
22
22
22
Secondary Return Ø BSP F (“)
0.5
0.5
0.5
0.5
0.5
0.5
T&P Connection Ø BSP F (“)
0.5
0.5
0.5
0.5
0.75
0.75
3bar
T&P Press. Set. (bar)
7
7
7
7
7
7
Exp. Relief Set. (bar)
6
6
6
6
6
6
Summary of Contents for BOSS 100
Page 4: ...www bssindustrial co uk 4 ...
Page 31: ...Boss Direct Indirect Installation Guide 31 Cylinder Schematic Electrical Diagram S Plan ...
Page 33: ...Boss Direct Indirect Installation Guide 33 Cylinder Schematic Electrical Diagram Y Plan ...
Page 44: ...www bssindustrial co uk 44 48 Direct Indirect Mains Pressure Benchmark Checklist ...
Page 45: ...Boss Direct Indirect Installation Guide 45 49 Water Storage System Commisioning ...
Page 47: ...Boss Direct Indirect Installation Guide 47 Notes ...