background image

The junction box can be moved to left-hand side of furnace when
a left-hand side power supply is desired. Remove 2 screws holding
junction box. Mount junction box on left-hand side of furnace. The
blower door interlock switch must also be moved to left-hand side
of furnace due to length of wiring harness. (Holes have been
provided in casing). When moved, tuck wiring harness behind clip
provided to keep extra wire lengths out of the way.

NOTE:

Proper polarity must be maintained for 115-v wiring. If

polarity is incorrect, the furnace control status LED will flash
rapidly and prevent heating operation.

B.

24-v Wiring

Refer to ESD Precautions Procedure before proceeding with 24-v
connections.

Make field 24-v connections at 24-v terminal block. (See Fig. 11.)
Connect terminal Y/Y2 as shown in Fig. 9 or 10 for proper cooling
operation. Use only AWG No. 18 or larger, color-coded copper
thermostat wire.

The 24-v circuit contains an automotive-type, 3-amp fuse located
on main control. Any 24-v electrical shorts during installation,
service, or maintenance could cause this fuse to blow. If fuse
replacement is required, use ONLY a 3-amp fuse. The control will
flash code 24 when fuse needs replacement.

C.

Accessories

1. Electronic air cleaner (EAC)

A terminal block (EAC-1 [hot] and EAC-2 [neutral]) is
provided for EAC connection. (See Fig. 11.) The terminals
are energized with 115v, 1-amp maximum during blower
motor operation.

2. Humidifier (HUM)

Screw terminals (HUM and C

OM

) are provided for 24-v

humidifier connection. The terminals are energized with
24v, 0.5-amp maximum when the gas valve is energized.

Fig. 9—Heating and Cooling Application Wiring Diagram 1-Stage Thermostat and Condensing Unit

A99071

115-V FUSED

DISCONNECT

SWITCH

(WHEN REQUIRED)   

JUNCTION
BOX   

CONTROL

BOX

24-V

TERMINAL

BLOCK  

TWO-WIRE

HEATING-

ONLY   

FIVE

WIRE

   

1-STAGE THERMOSTAT TERMINALS

FIELD-SUPPLIED

FUSED DISCONNECT

CONDENSING

UNIT   

FURNACE

COM

R

W

Y

R

G

C

GND

GND

GND

GND

GND

GND   

FIELD 24-V WIRING
FIELD 115-, 208/230-, 460-V WIRING
FACTORY 24-V WIRING
FACTORY 115-V WIRING   

208/230- OR
460-V
THREE
PHASE   

208/230-V
SINGLE
PHASE   

WHT   

BLK   

WHT   

BLK   

W/W1

W2

Y/Y2

G

NOTES: 

  

1.  Connect Y-terminal as shown for proper operation.

                2.  Some thermostats require a "C" terminal connection as shown.

3.  If any of the original wire, as supplied, must be replaced,
     use same type or equivalent wire.

TABLE 5—ELECTRICAL DATA

UNIT SIZE

VOLTS—
HERTZ—

PHASE

OPERATING

VOLTAGE RANGE

MAX

UNIT

AMPS

MIN

WIRE

GAGE

MAX WIRE

LENGTH (FT)‡

MAXIMUM FUSE OR

CKT BKR AMPS†

Max*

Min*

036040

115—60—1

127

104

11.4

14

32

15

024060

115—60—1

127

104

8.2

14

45

15

036060

115—60—1

127

104

10.6

14

34

15

042080

115—60—1

127

104

11.7

14

31

15

048080

115—60—1

127

104

13.4

14

27

15

036100

115—60—1

127

104

10.5

14

35

15

048100

115—60—1

127

104

13.2

14

28

15

060100

115—60—1

127

104

17.7

12

32

20

048120

115—60—1

127

104

13.2

14

28

15

060120

115—60—1

127

104

18.2

12

31

20

060135

115—60—1

127

104

17.4

12

33

20

* Permissible limits of the voltage range at which the unit will operate satisfactorily.
† Time-delay type is recommended.
‡ Length shown is as measured 1 way along wire path between unit and service panel for maximum 2 percent voltage drop.

—9—

Summary of Contents for 330AAV

Page 1: ...labels attached to or shipped with the unit and other safety precautions that may apply Follow all safety codes In the United States refer to the National Fuel Gas Code NFGC NFPA No 54 1999 ANSI Z223...

Page 2: ...6 12 11 16 4 134 042080 17 1 2 15 7 8 16 4 150 048080 21 19 3 8 19 1 2 4 154 036100 17 1 2 15 7 8 16 4 160 048100 21 19 3 8 19 1 2 4 166 060100 24 1 2 22 7 8 23 4 184 048120 21 19 3 8 19 1 2 5 178 060...

Page 3: ...require these instructions as a minimum for a safe installation CAUTION Application of this furnace should be in doors with special attention given to vent sizing and material gas input rate air tempe...

Page 4: ...on and ventilation air must be provided in accordance with Section 5 3 Air for Combustion and Ventilation of the NFGC or applicable provisions of the local building codes Canadian installations must b...

Page 5: ...with the outdoors shall be provided See item 2 below c If furnace is installed on a raised platform to provide a return air plenum and return air is taken directly from hallway or space adjacent to fu...

Page 6: ...sories All accesso ries MUST be connected external to furnace main casing IV RETURN AIR CONNECTIONS CAUTION For airflow requirements above 1800 CFM see Air Delivery table in Product Data literature fo...

Page 7: ...le in each bottom corner of furnace as shown in Fig 7 2 Install nut on bolt and install bolt and nut in hole Install flat washer if desired 3 Install another nut on other side of furnace base Install...

Page 8: ...een gas control manifold and manual shutoff valve WARNING Use the proper length of pipes and ad equate piping support to avoid stress on the gas control manifold A failure to follow this warning can c...

Page 9: ...24 v humidifier connection The terminals are energized with 24v 0 5 amp maximum when the gas valve is energized Fig 9 Heating and Cooling Application Wiring Diagram 1 Stage Thermostat and Condensing U...

Page 10: ...and high gas heat for optimum comfort Setup switch 2 SW 2 must be in the factory shipped OFF position See Fig 12 and Tables 6 and 7 for setup switch information If a 2 stage heating thermostat is to b...

Page 11: ...ec tion is based on stored history of thermostat cycle times When wall thermostat calls for heat R W W1 circuit closes The furnace control performs a self check verifies the low heat and high heat pre...

Page 12: ...high gas heat and vice versa a Switching from low to high gas heat If thermostat R W W1 circuit for low gas heat is closed and R W2 circuit for high gas heat closes the control CPU switches the induc...

Page 13: ...et thermal overload switches 4 Blower motor speed selections are for average conditions See Installation Instructions for details on optimumspeed selection 5 Replace only with a 3 AMP fuse 6 Auxiliary...

Page 14: ...r motor BLWM speed by sensing only G for low cool speed and Y2 for high cool speed 2 The EAC terminals EAC 1 and EAC 2 are ener gized with 115v when the blower motor BLWM is operating on either coolin...

Page 15: ...al gas supplier b Obtain yearly specific gravity average from local gas supplier c Verify furnace model Table 9 can only be used for model 330AAV Furnaces d Find installation altitude in Table 9 NOTE...

Page 16: ...t connections See Fig 12 This keeps furnace locked in high heat operation Repeat items h through k for high heat operation EXAMPLE High heat operation at 0 2000 ft altitude Furnace input from rating p...

Page 17: ...3 6 1 5 44 3 8 1 6 43 3 4 1 4 43 3 5 1 5 43 3 6 1 5 2001 825 44 3 4 1 4 44 3 5 1 5 44 3 7 1 5 44 3 8 1 6 43 3 4 1 4 to 850 44 3 2 1 4 44 3 3 1 4 44 3 4 1 5 44 3 6 1 5 44 3 7 1 5 3000 875 45 3 7 1 6 4...

Page 18: ...4 750 45 3 4 1 4 45 3 5 1 5 45 3 6 1 5 45 3 7 1 6 45 3 8 1 6 775 45 3 2 1 3 45 3 3 1 4 45 3 4 1 4 45 3 5 1 5 45 3 6 1 5 5001 800 47 3 5 1 5 47 3 6 1 5 45 3 2 1 3 45 3 3 1 4 45 3 4 1 4 825 48 3 8 1 6...

Page 19: ...Pressure High Low U S A Only 600 45 3 4 1 4 45 3 5 1 5 45 3 6 1 5 45 3 7 1 6 45 3 8 1 6 625 47 3 7 1 6 45 3 2 1 4 45 3 3 1 4 45 3 4 1 4 45 3 5 1 5 8001 650 47 3 4 1 4 47 3 5 1 5 47 3 6 1 5 45 3 2 1 3...

Page 20: ...TE CU FT HR SECONDS FOR 1 REVOLUTION SIZE OF TEST DIAL SECONDS FOR 1 REVOLUTION SIZE OF TEST DIAL 1 cu ft 2 cu ft 5 cu ft 1 cu ft 2 cu ft 5 cu ft 10 11 12 13 14 360 327 300 277 257 720 655 600 555 514...

Page 21: ...normal start up allow furnace to operate for 2 minutes then block flue outlet 100 percent Furnace should cycle off within 2 minutes d Remove blockage and reconnect vent connector to furnace flue coll...

Page 22: ...22...

Page 23: ...23...

Page 24: ...video based formats and materials All include video and or slides plus companion book Classroom Service Training plus hands on the products in our labs can mean increased confidence that really pays d...

Reviews: