27
B127527_00_03
Installation
5.3
Checklist of Installation Requirements
Table 5.2:
Installation requirement checklist
One cylinder of Nitrogen gas.
One cylinder of Helium gas.
Quantities of liquid Helium and Nitrogen in transport dewars.
Three power sockets (230 V / 16 A single phase or 208 V / 20 A single
phase or 110 V / 20 A). The power outlets will be used to run a vacuum
pump, a heat gun and a power supply unit. These power outlets must be
available in addition to the power source used to run the spectrometer.
Step ladder (non-magnetic e.g. aluminum or wood).
Where possible the customer should provide a heat gun or powerful
handheld air dryer (min. 800 W), a roughing pump (10
-2
mbar) and a pair
of insulated gloves. If those items can not be provided by the customer,
then Bruker can provide them.
Summary of Contents for BioSpin NMR Fourier 300
Page 1: ...Version Innovation with Integrity Fourier 003 Site Planning User Manual NMR ...
Page 10: ...10 B127527_00_03 Safety This page intentionally left blank ...
Page 14: ...14 B127527_00_03 Magnet Access and Rigging This page intentionally left blank ...
Page 28: ...28 B127527_00_03 Installation This page intentionally left blank ...
Page 30: ...30 B127527_00_03 Contact This page intentionally left blank ...
Page 31: ......
Page 32: ...Bruker Corporation info bruker com www bruker com Order No B127527 ...