24
B127527_00_03
Lab Requirements
4.9.1
Checklist for Utility Requirements
Table 4.5:
Utility requirement checklist
Provision must be made for any additional electrical power requirements
for extra equipment that will be installed.
Additional electrical outlets are required for turbo-pumps and magnet
power supply during installation and service.
A voltage stabilizer must be available if the line voltage fluctuation
exceeds -5% to +10%.
An UPS should be considered if power outages are frequent.
The power supply to the spectrometer should be clean.
A minimum of one compressed gas line with one regulated output must
be available.
Provision must be made for gas requirements of any accessories used.
Summary of Contents for BioSpin NMR Fourier 300
Page 1: ...Version Innovation with Integrity Fourier 003 Site Planning User Manual NMR ...
Page 10: ...10 B127527_00_03 Safety This page intentionally left blank ...
Page 14: ...14 B127527_00_03 Magnet Access and Rigging This page intentionally left blank ...
Page 28: ...28 B127527_00_03 Installation This page intentionally left blank ...
Page 30: ...30 B127527_00_03 Contact This page intentionally left blank ...
Page 31: ......
Page 32: ...Bruker Corporation info bruker com www bruker com Order No B127527 ...