BROWAN COMMUNICATIONS
Page
14
Hardware Installation
Installing the Access Point
Use the following procedure to prepare your network connection to BW2250.
Use the enclosed POE and power cord or any others IEEE802.3af Compliant POE
Power Source Devices to supply your BW2250 Access Point.
Step 1
Assemble part 1 of the Mount Kit at the back of the bottom cover as shown in the figure 4:
Figure 4 – Assembling the Mounting Kit to the BW2250
Step 2
If you are mounting the AP on the wall; first install the bracket 2 of the mounting kit to a
suitable position. Assemble the back of the BW2250 case to the bracket subsequently.
Step 3
If you are mounting the AP to a mast; first install the bracket 2 and the clip 3 of the Mounting
to a mast. Assemble the back of the BW2250 case to the bracket subsequently
Step 4
Assemble the one side of an Ethernet twist cable with the waterproof RJ45 connector.
Please read the description sheet in Waterproof RJ45 Connector package carefully
before you do the assembly.
Step 5
Insert the Ethernet twist cable to the LAN port connector on the back of the BW2250
Bottom Cover and screw down the nut.
Step 6
Connect two RF connectors to the Antennas by Jump RF cable with waterproof N-type
plug.
①
②
③
Summary of Contents for BW2250
Page 69: ...BROWAN COMMUNICATIONS Page 68 ...