3 - 148
Main parts
Embroidery
21
X driving gear pulley assembly attachment
1. Apply a bead of EPNOC AP (N)0 to the shaft of the main frame sub
assembly.
2. Insert the driving gear pulley assembly
1
into the shaft of the main frame
sub assembly.
*Key point
• Position the driving gear pulley assembly with the pulley on
the top.
• Insert the driving gear pulley assembly until the hook is caught
in the groove on the shaft of the main frame sub assembly (a
click can be heard).
Apply EPNOC AP (N)0 to the shaft of the main frame
sub assembly.
Bead
1
22
X tension pulley assembly attachment
1. Hang the timing belt (X belt)
1
over the driving gear pulley assembly
2
.
2. Hang the other end of the timing belt
1
over the tension pulley assembly
3
, and then attach the tension pulley assembly
3
to the left side of the
main frame assembly with the 2 screws
1
.
*Key point
• Move the tension pulley assembly to the left to attach it.
• Tighten the screw
1
on the right lightly (0.19 - 0.39 Nm).
• Refer to "X-belt tension adjustment" on page 4 - 29 for the
tension adjustment procedure.
1
Torque
0.19 – 0.39 N
·
m
1.18 – 1.57 N
·
m
1
3
2
1
2
Screw, Pan (S/P washer)
M4X8
Color; Silver
Summary of Contents for Innov-is NV4000D
Page 1: ......
Page 2: ......
Page 19: ...1 5 Outline of Mechanism Outline of Mechanism Control system block diagram ...
Page 24: ...2 2 Main parts location diagram Main unit ...
Page 40: ...2 18 Power unit motor unit location diagram Main unit ...
Page 46: ...2 24 Thread tension unit location diagram Main unit ...
Page 57: ...2 35 Disassembly Bobbin winder location diagram Main unit ...
Page 66: ...2 44 Needle presser unit needle threader unit upper shaft unit location diagram Main unit ...
Page 71: ...2 49 Disassembly Needle presser module location diagram Modules ...
Page 89: ...2 67 Disassembly Needle thread module location diagram Modules ...
Page 95: ...2 73 Disassembly Feed rotary hook module location diagram Modules ...
Page 109: ...2 87 Disassembly Side feed module location diagram Modules ...
Page 112: ...2 90 Thread cutter module location diagram Modules ...
Page 117: ...2 95 Disassembly Main parts location diagram Embroidery ...
Page 134: ...3 2 Needle presser unit needle threader unit upper shaft unit location diagram Main unit ...
Page 146: ...3 14 Bobbin winder unit location diagram Main unit ...
Page 154: ...3 22 Thread tension unit location diagram Main unit ...
Page 169: ...3 37 Assembly Power unit motor unit location diagram Main unit ...
Page 175: ...3 43 Assembly Main parts location diagram Main unit ...
Page 191: ...3 59 Assembly Thread cutter module location diagram Module ...
Page 198: ...3 66 Side feed module location diagram Module ...
Page 202: ...3 70 Feed rotary hook module location diagram Module ...
Page 227: ...3 95 Assembly Needle thread module location diagram Module ...
Page 236: ...3 104 Needle presser module location diagram Module ...
Page 266: ...3 134 Main parts location diagram Embroidery ...
Page 369: ...6 1 6Special Instructions of Wiring ...
Page 372: ...5 Upper shaft cover 6 Lead wire guide of PCB holder 1 2 3 6 4 ...
Page 378: ...1 Front cover 2 Front cover Tie with a band 6 10 ...
Page 379: ...3 Inverter cover Enlarged picture 6 11 Special Instructions of Wiring ...
Page 381: ......