200768_1
11
Assembly – Positioning of the Logs
STEP 1
– Place the main ceramic base in position as below
Using the 2 off M5 C/Sunk Bolts provided, locate the decorative trim behind the stove
opening as shown and secure in position.
Although it is possible to position all of the ceramics first, we recommend fitting
the log retainer at this point as it will make things easier.