11
www.bromicheating.com
INSTALLATION INSTRUCTIONS
CONTINUED...
For Fenwal control
•
Feed wiring harness (3 wires) through opening
under Fenwal controller so that wires are positioned
to the left of the controller.
•
Connect black ignition cable directly to control
box at terminal marked:
•
Connect white ionisation cable directly to control
box at terminal marked: S1
•
Connect ground terminal over ground tab,
attached to body of control housing and marked
with the symbol:
8. Connect gas inlet fitting to mains gas supply in
accordance with local gas installation code and
gas supply installation section of manual. Leak test
with soapy water.
9. Fix Front cover to control housing using the 8xM4
screws provided.
10. Main Power supply connection is to completed in line
with instructions in the “Power supply installation”
section of this manual.
ImPortant
After gas installation and electrical installation is complete,
all gas lines should be tested for leaks using a soapy water
solution. See Section titled “Leakage Test” for further
information. Ensure gas pressure meets the requirements
outlined in Gas Supply Installation above.
!
ImPortant
Ensure that a water tight seal is maintained.
!