3-20
6. After the system shows signs of filling, run it in neutral and low idle for 5 minutes.
Then extend the outriggers so that drive wheels can spin freely. Reconnect the
brake release valve if disconnected in step 3. Place the control switch in the
FORWARD position and slowly push the accelerator until the wheels turn slowly.
Run for 5 minutes and repeat in REVERSE direction. Then increase to full throttle
for one minute in each direction.
7. Check fluid level in the reservoir and fill to the proper level. Check all line
connections for leaks and tighten if necessary.
Summary of Contents for IC-35-2G
Page 6: ...1 2 DIMENSIONS AND ORIENTATION IC 35 2G...
Page 7: ...1 3 TURNING DIMENSIONS...
Page 16: ......
Page 29: ...2 13 CRANE CAPACITY CHART FOR IC 35 2G...
Page 30: ...2 14 CRANE CAPACITY CHART FOR IC 35 2G METRIC...
Page 38: ......
Page 47: ...3 9 IC 35 LUBRICATION CHART...
Page 51: ...3 13 JIC SCHEMATIC...
Page 52: ...3 14 JIC SCHEMATIC METRIC...
Page 54: ...3 16 STEERING SYSTEM...
Page 56: ...3 18 IC 35 PROPULSION SYSTEM...
Page 70: ......
Page 71: ......